Tender Details
Particulars | Details |
---|---|
Title |
Spillage Of Coal At The Time Of Loading Of Wagon And Removal Of Coal Incase Of Overloaded Wagon And Loading The Same Quantity Of Coal Into Another Railway Rake From In Motion W/B To Buffer End At Railway Siding One Year (36 Days) At Sawang Washery.
|
Description |
Spillage Of Coal At The Time Of Loading Of Wagon And Removal Of Coal Incase Of Overloaded Wagon And Loading The Same Quantity Of Coal Into Another Railway Rake From In Motion W/B To Buffer End At Railway Siding One Year (36 Days) At Sawang Washery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_309731_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/29 Date 04.06.2024 |
Tender Fee | 0 |
EMD | 5600 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320922 |
Start Date | June 05, 2024 16:30 |
End Date |
14/06/2024 ( Expired 311 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work for witnessing the entire process of third-party coal sampling carried out by tpsa and its technical service provider at the loading end of various railway siding/ mines of m/s wcl and collection, shifting of the mppgcl part of coal samples from
Work for witnessing the entire process of third-party coal sampling carried out by tpsa and its technical service provider at the loading end of various railway siding/ mines of m/s wcl and collection, shifting of the mppgcl part of coal samples from
Read moreDismantling, fabrication/erection of damaged loading chute for loading of washed coal and washed coal power in railway wagon at railway siding of sawang washery.
Dismantling, fabrication/erection of damaged loading chute for loading of washed coal and washed coal power in railway wagon at railway siding of sawang washery.
Read moreSecunderabad division-bpq-kzj section:- sw-i: - supply, stacking of 50mm gauge hard and durable machine crushed stone ballast to railway s specification at ballast depot at sirpur town station and loading the same into railway hoppers/traffic ballast wagons by mechanical means. (qty---1,00,000cum) sw-ii:-sirpur town station:-i) provision of new ballast siding. ii) provision of formation, approach road, yard drain, and buffer end for ballast siding.
For complete deion and other details, please refer to tender
Read moreTransportation of rom coal from secl gevra ocm to railway siding and loading in indian railway wagons for onward transportation through end to end rcr mode to shree singaji thermal power project, khandwa m.p.
Transportation of rom coal from secl gevra ocm to railway siding and loading in indian railway wagons for onward transportation through end to end rcr mode to shree singaji thermal power project, khandwa m.p.
Read moreTransportation of rom coal from secl kusmundaocm to railway siding and loading in indian railway wagons for onward transportation through end to end rcr mode to shree singaji thermal power project khandwa mp
Transportation of rom coal from secl kusmunda ocm to railway siding and loading in indian railway wagons for onward transportation through end to end rcr mode to shree singaji thermal power project khandwa mp
Read moreTransportation of rom coal from secl dipka ocm to railway siding and loading in indian railway wagons for onward transportation through end to end rcr mode to shree singaji thermal power project, khandwa m.p.
Transportation of rom coal from secl dipka ocm to railway siding and loading in indian railway wagons for onward transportation through end to end rcr mode to shree singaji thermal power project, khandwa m.p.
Read moreRemoval /up-keeping of foreign material of supplied railway empty wagon before loading of washery product for one year at sawang washery.
Removal /up-keeping of foreign material of supplied railway empty wagon before loading of washery product for one year at sawang washery.
Read moreSpillage of coal at the time of loading of wagon and removal of coal incase of overloaded wagon and loading the same quantity of coal into another railway rake from in-motion w/b to buffer end at railway siding one year (36 days) at sawang washery.
Spillage of coal at the time of loading of wagon and removal of coal incase of overloaded wagon and loading the same quantity of coal into another railway rake from in-motion w/b to buffer end at railway siding one year (36 days) at sawang washery.
Read moreRemoval of accumulated spillage coal of different section and drain cleaning around the plant at sawang washery.
Removal of accumulated spillage coal of different section and drain cleaning around the plant at sawang washery.
Read moreDust suppression by truck mounted tanker on coal transportation public road from mahdeiya railway level crossing no.16 in front of block-b gm office of pr siding track level crossing at block-b project. (for 730 days).
Dust suppression by truck mounted tanker on coal transportation public road from mahdeiya railway level crossing no.16 in front of block-b gm office of pr siding track level crossing at block-b project. (for 730 days).
Read moreof your Industry type