Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Fabrication/Erection Of Damaged Loading Chute For Loading Of Washed Coal And Washed Coal Power In Railway Wagon At Railway Siding Of Sawang Washery.
|
| Description |
Dismantling, Fabrication/Erection Of Damaged Loading Chute For Loading Of Washed Coal And Washed Coal Power In Railway Wagon At Railway Siding Of Sawang Washery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_325954_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/77 Date 16.01.2025 |
| Tender Fee | 0 |
| EMD | 3900 |
| Tender Value | |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337861 |
| Start Date | January 17, 2025 16:30 |
| End Date |
Expired
27/01/2025
Expired 518 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation of detailed project report (dpr) and tender documents for selection of an agency for construction of 5 mtpa coal washery at manoharpur coal mines
Preparation of detailed project report (dpr) and tender documents for selection of an agency for construction of 5 mtpa coal washery at manoharpur coal mines
Read moreSupply, fabrication and erection of balance ss piping and valves in block 103 and 114 of project inrpc, nrb tarapur.
Supply, fabrication and erection of balance ss piping and valves in block 103 and 114 of project inrpc, nrb tarapur.
Read moreDismantling and shifting of existing lt panels and restoration of power supply at 3rd floor cuffeparade te building mtnl mumbai.
Dismantling and shifting of existing lt panels and restoration of power supply at 3rd floor cuffeparade te building mtnl mumbai.
Read moreExecution of work of amc of railway siding track under the guidance and supervision of rites p way expert for routine and special maintenance of track at nuppl ghatampur kanpur uttar pradesh
Execution of work of amc of railway siding track under the guidance and supervision of rites p way expert for routine and special maintenance of track at nuppl ghatampur kanpur uttar pradesh
Read moreRate contract for supply, fabrication and erection of mild steel canopy and allied works at retail outlets under guwahati, tinsukia, silchar and imphal divisional offices of ioaod state office
Rate contract for supply, fabrication and erection of mild steel canopy and allied works at retail outlets under guwahati, tinsukia, silchar and imphal divisional offices of ioaod state office
Read moreDismantling and reconstrution of culvert deck slab at amaithisolai street in ward no 95.
Dismantling and reconstrution of culvert deck slab at amaithisolai street in ward no 95.
Read moreWork for erection of pole in long span and replacement of jarjar wire in edc fatehpur
Work for erection of pole in long span and replacement of jarjar wire in edc fatehpur
Read moreElectrical re-wiring of a type qtr no.(a)ntt/104 p.no.61519016,sunita devi (general mazdoor)(b)ntd/211 p.no.62895399 basdeo mahato(siding/wagon mazdoor)and (c )ntt/771 p.no.61438589 ganesh kumar(mech.fitter)at npts under sijua area
Electrical re-wiring of a type qtr no.(a)ntt/104 p.no.61519016,sunita devi (general mazdoor)(b)ntd/211 p.no.62895399 basdeo mahato(siding/wagon mazdoor)and (c )ntt/771 p.no.61438589 ganesh kumar(mech.fitter)at npts under sijua area
Read moreErection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrrangement at topa ocp under kuju area.
Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrangement at topa ocp under kuju area.
Read moreSurvey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey, design, fabrication, supply, installation, testing and commissioning of total 21.00 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreof your Industry type