Tender Details
Particulars | Details |
---|---|
Title |
Evacuation And Loading Of Pond Ash At Rtps Ash Dyke, Loading In Railway Rake Wagons, Nuisance Free Transportation In Road Cum Rail (Rcr) Mode And Unloading Of Pond Ash
|
Description |
Evacuation And Loading Of Pond Ash At Rtps Ash Dyke, Loading In Railway Rake Wagons, Nuisance Free Transportation In Road Cum Rail (Rcr) Mode And Unloading Of Pond Ash
|
Organisation | Damodar Valley Corporation | Public Sector Undertakings |
Tender Id | 2024_DVC_207578_1 |
Reference Number |
DVC/Tender/Head Quarter/EMPC Cell Elect. Deptt. Kolkata/CMM/Works and Service/00005 |
Tender Fee | 12000 |
EMD | 12.92 Lakh |
Tender Value | |
Place | RTPS, DVC |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=227068 |
Start Date | September 06, 2024 23:30 |
End Date |
19/09/2024 ( Expired 264 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of wbm road at top and bottom peripheral of ash pond 1 and 2 at bktps under capex 2025-26.
Construction of wbm road at top and bottom peripheral of ash pond 1 and 2 at bktps under capex 2025-26.
Read moreStrength. of 12 m. and 15m. wide road and drain sec. 4a and 9 m. wide road in parallal to railway line at y-1 kasganj and 9.00 m. wide road and drain sec. 4a at upavp y-1 kasganj.
Strength. of 12 m. and 15m. wide road and drain sec. 4a and 9 m. wide road in parallal to railway line at y-1 kasganj and 9.00 m. wide road and drain sec. 4a at upavp y-1 kasganj.
Read moreEngaging an agency for excavation, collection, loading and transportation of mineral sand from vt/ponmana mining area and unloading near to spiral plant at vt mining site
Engaging an agency for excavation, collection, loading and transportation of mineral sand from vt/ponmana mining area and unloading near to spiral plant at vt mining site
Read moreLoading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)
Loading of coal at colliery/colliery pit head/stack yard and transportation of coal by road with dumpers/ tippers/ hyva from different collieries/ coal washeries of bccl/ecl/ ccl/any other coal company tortps coalyard under distance slab-d(76-110 km)
Read moreWatering to the tree saplings along the southern side bund of ash dyke and secondary pond area at ash dyke and maintenance for a period of nine months from the date of commencement
Watering to the tree saplings along the southern side bund of ash dyke and secondary pond area at ash dyke and maintenance for a period of nine months from the date of commencement
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type