Tender Details
Particulars | Details |
---|---|
Title |
Improvement To Road Vr 53 Buti Warkhed To Juna Umali Road In Km 3/500 To 6/000 Tq.Malkapur Dist Buldhana
|
Description |
Improvement To Road Vr 53 Buti Warkhed To Juna Umali Road In Km 3/500 To 6/000 Tq.Malkapur Dist Buldhana
|
Organisation | Government of Maharashtra |
Tender Id | 2023_PWR_946477_8 |
Reference Number |
E-TENDERNOTICENO.39-2023-24 |
Tender Fee | 1180 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Office of The Superintending Eng.,P.W.Circle Akola |
Link | https://mahatenders.gov.in |
Start Date | September 20, 2023 19:30 |
End Date |
04/10/2023 ( Expired 587 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreOne time improvement of diverted road of old alignment from km 5/70 to km 19/60 of old nh 44a new nh108 in the state of mizoram
One time improvement of diverted road of old alignment from km 5/70 to km 19/60 of old nh 44a new nh108 in the state of mizoram
Read moreof your Industry type