Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement To Dalibandha Mip In Dhenkanal Block Of Dhenkanal District Under Improvement To Tank And Mip Scheme For The Year 2023 24.
|
| Description |
Improvement To Dalibandha Mip In Dhenkanal Block Of Dhenkanal District Under Improvement To Tank And Mip Scheme For The Year 2023 24.
|
| Organisation | Government of Odisha |
| Tender Id | 2024_CEMIB_99530_9 |
|
Reference Number |
DMID/10/2023-24 |
| Tender Fee | 6000 |
| EMD | 14900 |
| Tender Value | |
| Place | S.E, MI Division, Dhenkanal |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | January 10, 2024 20:30 |
| End Date |
Expired
19/01/2024
Expired 914 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreImprovement to sapuajhar mip in gondia block of dhenkanal district under erm scheme for the year 2023-24
Improvement to sapuajhar mip in gondia block of dhenkanal district under erm scheme for the year 2023-24
Read moreImprovement to bhagirathisagar mip in odapada block of dhenkanal district under imp to tank and mip scheme for the year 2024-25
Improvement to bhagirathisagar mip in odapada block of dhenkanal district under imp to tank and mip scheme for the year 2024-25
Read moreof your Industry type