Tender Details

Particulars Details
Title
Urgent Repairs To The Approach Road To Ktc Stand From Gv Ms Circle To Bus Stand In V.P. Bandora In Marcaim Constituency.
Description
Urgent Repairs To The Approach Road To Ktc Stand From Gv Ms Circle To Bus Stand In V.P. Bandora In Marcaim Constituency.
Organisation Government of Goa
Tender Id 2023_PWD_12983_1
Reference
Number
PWD/DIV.XVIII(R)/TECH/2023/F- 5/44/2023-24 LINE-1
Tender Fee 8000
EMD 1.45 Lakh
Tender Value
Place WD-XVIII(R), PWD, Ponda- Goa.
Link https://eprocure.goa.gov.in
Start Date December 19, 2023 00:25
End Date

02/01/2024 ( Expired 554 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Widening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including

Read more
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Read more
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode

Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode

Construction of road kibithu kundao from km 0.000 to km 52.000&#x0d design length 0.000 to 19.557 kms green field alignment to nhsl&#x0d specifications under project udayak in anjaw district of arunachal&#x0d pradesh state on epc mode&#x0d

Read more
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Read more
Major repairs to cement concrete approach road to head work at water supply scheme at bhatera, balaghat mine.

Major repairs to cement concrete approach road to head work at water supply scheme at bhatera, balaghat mine.

Read more
Construction of interlocking road and drain from the turn of pwd engineer house to santosh singh (kushbhar) house in ujjwal nagar kothi deeh of nagar palika parishad, nawabganj (length-605 m)

Construction of interlocking road and drain from the turn of pwd engineer house to santosh singh (kushbhar) house in ujjwal nagar kothi deeh of nagar palika parishad, nawabganj (length-605 m)

Read more
Laying of underground gas pipeline in nh-716 of tirupati to tiruthani to chennai section along the road from km. 61/510 to km. 81/540 (rhs) and km. 107/600 to km. 115/600 in the state of ap and from km 45/500 to km 61/510 (rhs) in the state of tn

Laying of underground gas pipeline in nh-716 of tirupati to tiruthani to chennai section along the road from km. 61/510 to km. 81/540 (rhs) and km. 107/600 to km. 115/600 in the state of ap and from km 45/500 to km 61/510 (rhs) in the state of tn

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise