Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Single Piece Ewc With Integrated Cistern. Confirming To Is 2556.
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/6302410 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | June 03, 2025 21:21 |
End Date |
18/06/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreCustomized uv-visible spectrometer to be integrated with the matrix isolation setup
Customized uv-visible spectrometer to be integrated with the matrix isolation setup
Read moreTtps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Read more132kv main bus augmentation to twin acsr zebra conductor along with augmentation of 132kv pather conductor to single zebra conductor for both 220/132kv 100mva transformers at 220kv namrup gss
132kv main bus augmentation to twin acsr zebra conductor along with augmentation of 132kv pather conductor to single zebra conductor for both 220/132kv 100mva transformers at 220kv namrup gss
Read moreProviding technical manpower to implementing laboratory information management system (lims) in all bphus (341) to integrate the analysed data with the integrated health management system of health and family welfare department, government of west be
Providing technical manpower to implementing laboratory information management system (lims) in all bphus (341) to integrate the analysed data with the integrated health management system of health and family welfare department, government of west be
Read moreWork of erection of octagonal streetlight poles with single arm/double arm/three arm and four arm for illumination of two pathways leading to st. anthony church vagator, under the jurisdiction of section office anjuna,sub division-ii, divxvii,mapusa.
Work of erection of octagonal streetlight poles with single arm/double arm/three arm and four arm for illumination of two pathways leading to st. anthony church vagator, under the jurisdiction of section office anjuna,sub division-ii, divxvii,mapusa.
Read moreNit for supply installation and commissioning of 100 l and 500 l biofermentrers with single control panel to fuilly automatic control of both 02 nos biofermenters
Supply installation and commissioning of 100 l and 500 l biofermentrers with single control panel to fuily automatic control of both 02 nos biofermenters
Read moreof your Industry type