Tender Details

Particulars Details
Title
Work Of Distempering Painting And Other Misc Repair In Fh 5 Type Ii In Canal Colony Gurugram
Description
Distempering Painting And Other Misc Repair
Organisation Haryana Government | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1680
EMD 1570
Tender Value
Place Gurugram
Link

AAAAAAAAAA

Login to view
Start Date May 08, 2025 22:35
End Date

21/05/2025 ( 8 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Read more
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Read more
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Internal painting and fixing of vitrified floor tiles in field hostel, regional headquarter, nerts, shillong

Internal painting and fixing of vitrified floor tiles in field hostel, regional headquarter, nerts, shillong

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Ward-58 construction work of drain and cc road on shanti vatika road in chandan nagar gulaab nagar.

Ward-58 construction work of drain and cc road on shanti vatika road in chandan nagar gulaab nagar.

Read more
Rehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar

Rehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar

Read more
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Read more
Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode

Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise