Tender Details
Particulars | Details |
---|---|
Title |
Wbphed/Ee/Amd/N Ie T 23 Of 2024 2025/1
|
Description |
Supply, Delivery And Installation Of Electro Mechanical Equipments And Other Allied Works At Pansuli Head Works Site Under Improvement Of Rcfa Part Iii(zone I) Water Supply Scheme Under Asansol Mechnical Division, P.H.E. Dte.
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2024_PHED_741301_1 |
Reference Number |
WBPHED/EE/AMD/NIeT-23of 2024-2025 |
Tender Fee | 0 |
EMD | 1 Lakh |
Tender Value | |
Place | PANSULI |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1637747 |
Start Date | August 31, 2024 00:25 |
End Date |
27/09/2024 ( Expired 206 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Niet no. - 03 of the fy 2025-2026 of the ee/bqa, phe dte.(3rd call)(sl.no-03)
Repairing and painting of over head reservoir (capacity 600 cum., staging height 20 mtr.) with all allied works of lurka (zone-vb) under raipur water supply scheme (brgf ph-i)) under khatra sub-division of bankura division, p.h.e. dte.
Read moreAAAAAAAAAA
Login to viewConstruction of r.c.c elevated reservoir of 700 cum. capacity of staging height 20m at head works site with annular combined pile raft foundation for badkulla zone-ii water supply scheme under nadia division p.h. engineering dte
Read moreAdditional work for development of headwork site and allied works under augmentation of jemua piped water supply scheme under durgapur faridpur block under rcfa division-i phe dte.
Additional work for development of headwork site and allied works under augmentation of jemua piped water supply scheme under durgapur faridpur block under rcfa division-i phe dte.
Read moreSupply, delivery, installation, commissioning and trial of electro mechanical component along with cu wound line voltage corrector forground water based piped water supply scheme augmentation of purba chepani water supply scheme.,p/h-i (aug) unde
Supply, delivery, installation, commissioning and trial of electro mechanical component along with cu wound line voltage corrector forground water based piped water supply scheme augmentation of purba chepani water supply scheme.,p/h-i (aug) unde
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at new budha zone-29 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at new budha zone-29 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for newly sunk tube well of pump house no. ii under jaulia piped water supply scheme, block- bharatpur-ii and kharsa piped water s
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for newly sunk tube well of pump house no. ii under jaulia piped water supply scheme, block- bharatpur-ii and kharsa piped water s
Read moreWater supply arrangement at different area of kanksa block under paschim bardhaman district through 01 (one) no 2000 ltr capacity water tanker (govt. owned vehicle) under rcfa division-i, phe dte. (for 03 months)
Water supply arrangement at different area of kanksa block under paschim bardhaman district through 01 (one) no 2000 ltr capacity water tanker (govt. owned vehicle) under rcfa division-i, phe dte. (for 03 months)
Read moreInstallation of display board for demarcation of sajal gram under jjm work at different pipe water supply scheme under jamboni block under jhargram division phe dte.
Installation of display board for demarcation of sajal gram under jjm work at different pipe water supply scheme under jamboni block under jhargram division phe dte.
Read moreDesigning, supplying, erecting, testing and commissioning of pure water pumping machinery at various sumps with all allied electro-mechanical equipments in 27 villages under amrut 1.0 scheme
Designing, supplying, erecting, testing and commissioning of pure water pumping machinery at various sumps with all allied electro-mechanical equipments in 27 villages under amrut 1.0 scheme
Read moreAAAAAAAAAA
Login to viewProviding and installation of power backup arrangement with allied works at office of the assistant engineer khatra sub-division. p.h.e dte. under bankura mechanical division, p.h.e. dte. in the district of bankura.
Read moreof your Industry type