Tender Details

About Tender

πŸŒ‰ Construction Opportunity: 3 Lane Bridge Over River Ganga πŸ—οΈπŸŒŠ The National Highways Authority Of India (Nhai) Is Inviting Tenders For The Construction Of An Additional 3 Lane Bridge Over The River Ganga, Connecting Buxar And Bharauli On Nh 922, Under The Hybrid Annuity Mode. πŸ›£οΈ πŸ“… Bid Submission Deadline: May 03, 2024, 11:00 Am πŸ’Έ Tender Fee: Inr 500,000 πŸ’° Earnest Money Deposit (Emd): Inr 44,40,000 This Project Is A Significant Infrastructure Development Initiative And Is Open To Experienced Contractors With A Proven Track Record In Large Scale Bridge Construction. Interested Parties Must Submit Detailed Tenders, Including Technical And Financial Bids, By The Specified Deadline. Keywords: Construction, Bridge, River Ganga, National Highways Authority Of India, Hybrid Annuity Mode, Nh 922, Buxar, Bharauli, Infrastructure Development, Tender, Emd
Particulars Details
Title
Construction Of Additional 3 Lane Bridge Over River Ganga For Connection Between Buxar And Bharauli On Nh 922 In The State Of Uttar Pradesh And Bihar On Hybrid Annuity Mode (2nd Call)
Description
Construction Of Additional 3 Lane Bridge Over River Ganga For Connection Between Buxar And Bharauli On Nh 922 In The State Of Uttar Pradesh And Bihar On Hybrid Annuity Mode (2nd Call)
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_191607_1
Reference
Number
NHAI/HQ/BH/Bharauli Haidaria/Proc/2023
Tender Fee 50000
EMD 4.44 Crore
Tender Value
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=209811
Start Date March 16, 2024 00:00
End Date

05/08/2024 ( Expired 332 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode

Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Development of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme

Development of stp and associated infrastructure at lohta varanasi uttar pradesh including operation and maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme

Read more
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.

Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.

Read more
Development of sewage treatment plants and associated infrastructure for pt. deen dayal upadhyay nagar (ddu nagar), state of uttar pradesh on hybrid annuity model basis under namami gange program

Development of sewage treatment plants and associated infrastructure for pt. deen dayal upadhyay nagar (ddu nagar), state of uttar pradesh on hybrid annuity model basis under namami gange program

Read more
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Read more
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Read more
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise