Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ Construction Opportunity: 3 Lane Bridge Over River Ganga ๐๏ธ๐ The National Highways Authority Of India (Nhai) Is Inviting Tenders For The Construction Of An Additional 3 Lane Bridge Over The River Ganga, Connecting Buxar And Bharauli On Nh 922, Under The Hybrid Annuity Mode. ๐ฃ๏ธ ๐ Bid Submission Deadline: May 03, 2024, 11:00 Am ๐ธ Tender Fee: Inr 500,000 ๐ฐ Earnest Money Deposit (Emd): Inr 44,40,000 This Project Is A Significant Infrastructure Development Initiative And Is Open To Experienced Contractors With A Proven Track Record In Large Scale Bridge Construction. Interested Parties Must Submit Detailed Tenders, Including Technical And Financial Bids, By The Specified Deadline. Keywords: Construction, Bridge, River Ganga, National Highways Authority Of India, Hybrid Annuity Mode, Nh 922, Buxar, Bharauli, Infrastructure Development, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Construction Of Additional 3 Lane Bridge Over River Ganga For Connection Between Buxar And Bharauli On Nh 922 In The State Of Uttar Pradesh And Bihar On Hybrid Annuity Mode (2nd Call)
|
| Description |
Construction Of Additional 3 Lane Bridge Over River Ganga For Connection Between Buxar And Bharauli On Nh 922 In The State Of Uttar Pradesh And Bihar On Hybrid Annuity Mode (2nd Call)
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_191607_1 |
|
Reference Number |
NHAI/HQ/BH/Bharauli Haidaria/Proc/2023 |
| Tender Fee | 50000 |
| EMD | 4.44 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=209811 |
| Start Date | March 16, 2024 00:00 |
| End Date |
Expired
05/08/2024
Expired 804 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Read moreSix-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreConsultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Consultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreConsultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read more4l of kolhapur sangli sec of nh166 from sangli phata km 0.00 to chokak km 7.738 n chokak km 145.300 to ankali km171.171 length33.609 km in maharashtra to be executed on hybrid annuity mode under nh o
4l of kolhapur sangli sec of nh166 from sangli phata km 0.00 to chokak km 7.738 n chokak km 145.300 to ankali km171.171 length33.609 km in maharashtra to be executed on hybrid annuity mode under nh o
Read moreUpgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
Upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode
Read moreDevel. of 6l ac gf regional expressway on northern side of hyderabad from girmapur vill ch1.518 to pragnapur ch.82.000 for a design length of 83.518 km in telangana under nh o on hybrid annuity mode pkg i
Devel. of 6l ac gf regional expressway on northern side of hyderabad from girmapur vill ch1.518 to pragnapur ch.82.000 for a design length of 83.518 km in telangana under nh o on hybrid annuity mode pkg i
Read moreof your Industry type