Tender Details

Particulars Details
Title
Temporary Arrangement For Road Illumination Zone B 4 Nos. Locations From Dolonghata To Bunorhat In Connection With Ganga Sagar Mela 2025 (For 9 Days).
Description
Temporary Arrangement For Road Illumination Zone B 4 Nos. Locations From Dolonghata To Bunorhat In Connection With Ganga Sagar Mela 2025 (For 9 Days).
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2024_WBPWD_789621_1
Reference
Number
WBPWD/EE/S24PED/eNIT115/24-25
Tender Fee 0
EMD 10861
Tender Value
Place Dolonghata to Bunorhat
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1752272
Start Date December 24, 2024 20:30
End Date

30/12/2024 ( Expired 185 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod

Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod

Read more
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode

Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Widening, strengthening of road with dbm, bc from nahalgaon to nalbari village under fulguri vcdc, chirang district, btr fund for the year 2025-26 under infrastructure development scheme. tn_02_16

Widening, strengthening of road with dbm, bc from nahalgaon to nalbari village under fulguri vcdc, chirang district, btr fund for the year 2025-26 under infrastructure development scheme. tn_02_16

Read more
For modernization of various link road patiala rajpura road gurudwara nim sahib via daun kalan jafarnagar in mc patiala with 5 year maintenance, mc patiala under special assistance to state for capital investment 2025-26 600 crore project , distt pa

For modernization of various link road patiala rajpura road gurudwara nim sahib via daun kalan jafarnagar in mc patiala with 5 year maintenance, mc patiala under special assistance to state for capital investment 2025-26 600 crore project , distt pa

Read more
Cement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07

Cement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise