Tender Details

Particulars Details
Title
Constructing Of Achej Pipeline Through Underground Hdpe Pipeline From Harizan Basti Pond Rd 0 To Rd 4925 Outfalling Into Jsb Near Rd 274000 L Of Jln Feeder.
Description
Laying Of Hdpe Pipeline
Organisation Haryana Government | State Govt. and UT
Tender Id 2024_HRY_348938_1
Reference
Number
20243B2449A8 BDC9 452A 92ED 24E7DE80C1711768IRR
Tender Fee 2180
EMD 42300
Tender Value -
Place ACHHEJ
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=424211

Start Date January 30, 2024 19:30
End Date
Expired 12/02/2024

Expired 938 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Laying rcc pipeline in village khatiwas outfalling into mp majra link drain at rd 500

Laying rcc pipeline in village khatiwas outfalling into mp majra link drain at rd 500

Read more
Laying pressurized pipeline for dewatering of kandharwala johad and outfalling into aurangpur link drain at rd 10500-r

Laying pressurized pipeline for dewatering of kandharwala johad and outfalling into aurangpur link drain at rd 10500-r

Read more
Laying pressurized pipeline for dewatering flooded fields of village sarola and outfalling into zahidpur minor at rd 9500-r

Laying pressurized pipeline for dewatering flooded fields of village sarola and outfalling into zahidpur minor at rd 9500-r

Read more
Constructing of pipeline drain for dewatring of fields water of village gorakhpur fron rd 17500 to 21300 (3800 ft) outfalling into fatehabad branch at rd 129000-l.

Constructing of pipeline drain for dewatring of fields water of village gorakhpur fron rd 17500 to 21300 (3800 ft) outfalling into fatehabad branch at rd 129000-l.

Read more
Clearance of flood water of village ashiaki gorawas through laying of pipeline and constructing sumpwell outfalling into lohari minor at rd 5326/r

Clearance of flood water of village ashiaki gorawas through laying of pipeline and constructing sumpwell outfalling into lohari minor at rd 5326/r

Read more
Constructing underground rcc np2 pipeline drain for dewatering of flood water of village laluwal from rd 1560 to 0 linking with existing pipeline drain houdi at rd 6110 outfalling into rangoi nallah at rd 6.35 km left side

Constructing underground rcc np2 pipeline drain for dewatering of flood water of village laluwal from rd 1560 to 0 linking with existing pipeline drain houdi at rd 6110 outfalling into rangoi nallah at rd 6.35 km left side

Read more
Supply erection and commissioning of 2 no. ht pumps of 10 cs capacity with other allied accessories complete in all respect at mundsa link drain and pressurized pipeline outfalling into ditch drain along jln feeder near rd 306000 r in mundsa.

Supply erection and commissioning of 2 no. ht pumps of 10 cs capacity with other allied accessories complete in all respect at mundsa link drain and pressurized pipeline outfalling into ditch drain along jln feeder near rd 306000 r in mundsa.

Read more
Raising hos of pipeline of village pauli outfalling rd 4000/r of poli lizwana drain (ext. work)

Raising hos of pipeline of village pauli outfalling rd 4000/r of poli lizwana drain (ext. work)

Read more
Laying hdpe (450mm dia) and rcc np3 (1000mm dia) pipeline from mundakhera village fields outfalling into outfall drain no. 8

Laying hdpe (450mm dia) and rcc np3 (1000mm dia) pipeline from mundakhera village fields outfalling into outfall drain no. 8r.

Read more
Laying hdpe (450mm dia) and rcc np3 (1000mm dia) pipeline from khudana pond to subana village fields outfalling into subana pipeline link drain pump house

Laying hdpe (450mm dia) and rcc np3 (1000mm dia) pipeline from khudana pond to subana village fields outfalling into subana pipeline link drain pump housepipeline link drain pump house.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise