Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kollam Corporation Urban Agglomeration Project No. S 0979/23 Supply, Installation, Testing And Commissioning Of Musical Fountain In Ashtamudi Lake Including Operation And Maintenance For One Year.
|
| Description |
Kollam Corporation Urban Agglomeration Project No. S 0979/23 Supply, Installation, Testing And Commissioning Of Musical Fountain In Ashtamudi Lake Including Operation And Maintenance For One Year.
|
| Organisation | Kerala State Coastal Area Development Corporation | State Govt. and UT |
| Tender Id | 2024_SCADC_692554_1 |
|
Reference Number |
ET-32/2024-25 |
| Tender Fee | 2950 |
| EMD | 50000 |
| Tender Value | - |
| Place | Ashtamudi Lake , Kollam District |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1078406 |
| Start Date | September 25, 2024 23:45 |
| End Date |
Expired
05/10/2024
Expired 737 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreSelection of system integrator for supply, installation, integration, testing, commissioning and operation & maintenance of electronic toll collection (etc) system including medium speed weigh-in-motion (mswim) and static weigh bridge (swb) system (a) at toll plaza rosera-baheri-singhia road near bariyahi ghat-2 lane bridge over river kareh in dist. darbhanga in the state of bihar. (b) at toll plaza near h.l. r.c.c. bridge on bishunpur atarwel road over arai ri
Selection of system integrator for supply, installation, integration, testing, commissioning and operation & maintenance of electronic toll collection (etc) system including medium speed weigh-in-motion (mswim) and static weigh bridge (swb) system (a) at toll plaza rosera-baheri-singhia road near bariyahi ghat-2 lane bridge over river kareh in dist. darbhanga in the state of bihar. (b) at toll plaza near h.l. r.c.c. bridge on bishunpur atarwel road over arai river in the district of darbhanga in the state of bihar (c) at toll plaza near baluaha ghat 2 lane bridge over river koshi in dist. saharsa in the state of bihar
Read moreOperation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagar
Operation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagarkurnool (district)
Read moreKollam cor-urban agglomeration-cleaning, protection of bio diversity dredging of ashtamudi lake in ramsar site.supply and installation of dancing fountain in lake including operation and maintenance for one year.(oandm be extended to 5years re-tender
Kollam cor-urban agglomeration-cleaning, protection of bio diversity dredging of ashtamudi lake in ramsar site.supply and installation of dancing fountain in lake including operation and maintenance for one year.(oandm be extended to 5years re-tender
Read moreOperation and maintenance of water fountain and musical fountain
Operation and maintenance of water fountain and musical fountain
Read moreKollam corporation water conservation jeevananu ashtamudi jeevikkanam ashtamudi-(corporation and 12 panchayaths)protection of ashtamudi lake cleaning(project no.s 0494/23)-supply and installation of cctv
Kollam corporation water conservation jeevananu ashtamudi jeevikkanam ashtamudi-(corporation and 12 panchayaths)protection of ashtamudi lake cleaning(project no.s 0494/23)-supply and installation of cctv
Read moreMusical fountain repair
Repairs of musical fountain in bathukamma pond of sircilla municipality
Read moreProviding and installation of musical fountain at kasar lake at pen municipal council
Providing and installation of musical fountain at kasar lake at pen municipal council
Read moreProviding and installation of musical fountain at kavandal lake at pen municipal council
Providing and installation of musical fountain at kavandal lake at pen municipal council
Read moreof your Industry type