Tender Details

About Tender

🛠️ Bid Invitation For Repair Services Central Coalfields Limited 🏗️ Central Coalfields Limited (Cccl), A Public Sector Undertaking, Is Seeking Bids For The Repair Of Critical Mining Equipment At Sirka Colliery. The Scope Of Work Includes The Repair Of Cme 6/8, Dme 8/8, Dsm 4, And Both End Bearing Housings Of A 250 Kw High Tension (Ht) Motor For A Mine Dewatering Pump. 📅 Bid Submission Deadline: June 18, 2024, 2:00 Pm A Tender Fee Of Inr 2700 Has Been Set, With No Emd Required. Interested Vendors Must Possess The Necessary Technical Expertise And Experience In Repairing Heavy Electrical Equipment To Ensure The Highest Standards Of Quality And Reliability. Keywords: Repair Services, Central Coalfields Limited, Public Sector Undertaking, Heavy Electrical Equipment, Mine Dewatering Pump, Tender, Bid, Sirka Colliery
Particulars Details
Title
Repairing Of Cme 6/8, Dme 8/8, Dsm 4 And Both End Bearing Housing Of 250 Kw Ht Motor Of Mine Dewatering Pump Of Sirka Ocp
Description
Repairing Of Cme 6/8, Dme 8/8, Dsm 4 And Both End Bearing Housing Of 250 Kw Ht Motor Of Mine Dewatering Pump Of Sirka Ocp
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_309957_1
Reference
Number
PO/SG/EnM/Sirka/eNIT/24-25/01
Tender Fee 0
EMD 2700
Tender Value
Place Sirka Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321157
Start Date June 08, 2024 19:30
End Date

18/06/2024 ( Expired 377 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing of crowd intermediate shaft, crowd motor base plate, tie bar, bearing housing, driven-driving coupling and miscellaneous other repairing jobs in beas hmb555 ekg-5a shovel

Repairing of crowd intermediate shaft, crowd motor base plate, tie bar, bearing housing, driven-driving coupling and miscellaneous other repairing jobs in beas hmb555 ekg-5a shovel

Read more
Complete repairing, overhauling, maintenance and onsite commissioning of 2 nos. dsm-3 pump kirloskar make, base plate repairing, tyre coupling, coupling bolt, pump-motor alignment and suction pipeline matching of kurpania and gandhinagar

Complete repairing, overhauling, maintenance and onsite commissioning of 2 nos. dsm-3 pump kirloskar make, base plate repairing, tyre coupling, coupling bolt, pump-motor alignment and suction pipeline matching of kurpania and gandhinagar

Read more
Refurbishment of existing 2000amps 6.6kv, vcb panels including supply, delivery,erection, testing and commissioning of 6.6kv ht vcb panels at ph-i of 132/6.6kv sub-statios bearing housing and vcbs for 1425kw, 1475kw and 1300kw pump sets at kodandapur, nasarlapally and godakondla under eam section, electrical sub division,td-iii, sahebnagar

Refurbishment of existing 2000 amps 6.6 kv, vcb panel including supply, delivery, erection, testing and commissioning of 6.6kv ht vcb panels at phase-i of 132 6.6kv substations, bearing housing and vcbs for 1425kw, 1475 kw and 1300 kw pump sets at kodandapur, nasarlapally and godakondla under eam section electrical sub division, transmission division no.iii, sahebnagar.

Read more
Dismantling of pump from base plate n pipe line and running repairing of dsm -6 pump (1000gpm) (kgw shed) and commissioning the pump wnp, make-kirloskar having punch sl. no. bnk/iwsp/dsm6/kgw/02 on base plate after repair with alignment

Dismantling of pump from base plate n pipe line and running repairing of dsm -6 pump (1000gpm) (kgw shed) and commissioning the pump wnp, make-kirloskar having punch sl. no. bnk/iwsp/dsm6/kgw/02 on base plate after repair with alignment

Read more
For providing and replacement of bearing overhauling and varnishing of 250kw 3.3kv ht motor make kirlosker sl.no.3161103-02 of nichitpur colliery

For providing and replacement of bearing overhauling and varnishing of 250kw 3.3kv ht motor make kirlosker sl.no.3161103-02 of nichitpur colliery

Read more
Repairing rectification and full overhauling with spares of 1000 gpm 100 mh model 8-8 dme, mnp make pump assembly at tapin north open cast project hazaribagh area.

Repairing rectification and full overhauling with spares of 1000 gpm, 100 mh, model 8-8 dme,mnp make pump assembly at tapin north open cast project hazaribagh area.

Read more
Complete repairing and converting 5 stage to 6 stage and fitting of pump of make mather and platt, 6 stage , pv-ii, 180m head , 550gpm, si.no.nakc/pump/pv-ii/06 of ug mine 2 seam of new akashkinaree colliery of govindpur area

Complete repairing and converting 5 stage to 6 stage and fitting of pump of make mather and platt, 6 stage , pv-ii, 180m head , 550gpm, si.no.nakc/pump/pv-ii/06 of ug mine 2 seam of new akashkinaree colliery of govindpur area

Read more
Complete repairing/ rewinding of 3.3kv, 250kw motor, kirloskar make, sn- 308030/-04 running as prime mover of 2000gpm, 120 mtr head pump in block-iv ocp.

Complete repairing/ rewinding of 3.3kv, 250kw motor, kirloskar make, sn- 308030/-04 running as prime mover of 2000gpm, 120 mtr head pump in block-iv ocp.

Read more
Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area

Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise