Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Laying Of Different Dia. Ms/Gi Pipe, Pvc Pipes, Valves Etc. On As And When Required Basis For Dewatering Of Mine And Fire Quenching At Sirka Ocp For A Period Of One Year.
|
| Description |
Dismantling, Laying Of Different Dia. Ms/Gi Pipe, Pvc Pipes, Valves Etc. On As And When Required Basis For Dewatering Of Mine And Fire Quenching At Sirka Ocp For A Period Of One Year.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_301121_1 |
|
Reference Number |
SO(EnM)/AA/eNIT23-24/24 |
| Tender Fee | 0 |
| EMD | 43000 |
| Tender Value | - |
| Place | Sirka Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311930 |
| Start Date | February 12, 2024 23:30 |
| End Date |
Expired
22/02/2024
Expired 969 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada
Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada
Read moreAnnual rate contract for the supply of 2 inch and 1.5 inch gi pipes, gi gate valves and 2 inch gi socket joints for water supply works
Annual rate contract for the supply of 2 inch and 1.5 inch gi pipes, gi gate valves and 2 inch gi socket joints for water supply works
Read moreDismantling, stacking, fabrication and erection of pipes and valves in rb#3 lime kiln use in srp mechanical
Dismantling, stacking, fabrication and erection of pipes and valves in rb#3 lime kiln use in srp mechanical
Read moreDismantling, mechanical cleaning and re-erection of valves flanged and non-flanged pipes in cbp #2 at pulp mill mechanical
Dismantling, mechanical cleaning and re-erection of valves flanged and non-flanged pipes in cbp #2 at pulp mill mechanical
Read moreErection, dismantling, shifting and maintenance of 440v/220v overhead (oh) line on as and when required basis for a period of 365 days (1 year) under birsa ocp.
Erection, dismantling, shifting and maintenance of 440v/220v overhead (oh) line on as and when required basis for a period of 365 days (1 year) under birsa ocp.
Read moreComprehensive maintenance of fire alarm systems and detectors with re-programming sensors spinkler system mcp and servicing and overhauling of control panels hooters siren and fire hydrant systems valves hose pipes reels gi ms di pipes and connect
Comprehensive maintenance of fire alarm systems and detectors with re-programming sensors spinkler system mcp and servicing and overhauling of control panels hooters siren and fire hydrant systems valves hose pipes reels gi ms di pipes and connect
Read moreDismantling and erection cum re arrangement of the 10 inch dia m.s. pipes along with other miscellaneous jobs, needed for shifting of the 2500 g.p.m. kirloskar make pump, in operation at the deep mine zone at r.o.c.p. mine under rajmahal area
Dismantling and erection cum re arrangement of the 10 inch dia m.s. pipes along with other miscellaneous jobs, needed for shifting of the 2500 g.p.m. kirloskar make pump, in operation at the deep mine zone at r.o.c.p. mine under rajmahal area
Read moreCa no.cwe bly/ge (e)/120 of 2026- 2027repair maint and replacement of main/ entire distribution pipeline network feeding, ci/ gi/ hdpe/ pvc pipes/ valves and allied works under ge (east) bareilly
Ca no.cwe bly/ge (e)/120 of 2026- 2027repair maint and replacement of main/ entire distribution pipeline network feeding, ci/ gi/ hdpe/ pvc pipes/ valves and allied works under ge (east) bareilly
Read moreNew making /repairing of priming pipe inter connection system with fitting of new gi pipes, union, bends, elbows, brass valves, threading setting and welding etc in 6nos. delivery ranges at damagoria colliery under cv area
New making /repairing of priming pipe inter connection system with fitting of new gi pipes, union, bends, elbows, brass valves, threading setting and welding etc in 6nos. delivery ranges at damagoria colliery under cv area
Read moreRepair replacement gi ms with seamless high carbon steel pipes of various sizes, all types of valves, valve pits, chambers water tanks and other misc connected work for rcc, north spring and south spring area at kasauli under ge kasauli
Repair replacement gi ms with seamless high carbon steel pipes of various sizes, all types of valves, valve pits, chambers water tanks and other misc connected work for rcc, north spring and south spring area at kasauli under ge kasauli
Read moreof your Industry type