Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
13/Ee(d/S)/2025 2026
|
Description |
Supply And Laying Of Lt Cable Of Size 400 Sqmm 3.5 C From Ess No. 7 New Moti Bagh To Gs Pillar No. 11, New Moti Bagh, New Delhi
|
Organisation | New Delhi Municipal Council | State Govt. and UT |
Tender Id | 2025_NDMC_272234_1 |
Reference Number |
13/EE(D/S)/2025-2026 |
Tender Fee | 0 |
EMD | 5387 |
Tender Value | |
Place | West Kidwai Nagar Zone New Delhi |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=357501 |
Start Date | May 15, 2025 23:30 |
End Date |
22/05/2025 ( Expired 29 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Raising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.
Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.
Read moreCa no. cwe/hills/pgh/20 of 2025-2026 special repair to road and other related works from bld no p32/3 to t point near map p-8/30 and from bld no p-6/01 to p-6/08 and aro complex at 7 e area at mil stn pithoragarh
Ca no. cwe/hills/pgh/20 of 2025-2026 special repair to road and other related works from bld no p32/3 to t point near map p-8/30 and from bld no p-6/01 to p-6/08 and aro complex at 7 e area at mil stn pithoragarh
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreLaying of new paver block from 688/8 to 727/8 and 728/8 to 767/8in ward no. 25 under zone no. 06
Laying of new paver block from 688/8 to 727/8 and 728/8 to 767/8in ward no. 25 under zone no. 06
Read moreLaying of new paver block from 229/7 to 367/7 and 369/7 to 543/7 in ward no. 25 under zone no. 06
Laying of new paver block from 229/7 to 367/7 and 369/7 to 543/7 in ward no. 25 under zone no. 06
Read moreSupply of fruit fresh at supply depot delhi cantt and its delivery points for period from 01 oct 2025 to 30 sep 2026
Supply of fruit fresh at supply depot delhi cantt and its delivery points for period from 01 oct 2025 to 30 sep 2026
Read moreSupply of veg fresh at supply depot delhi cantt and its delivery points for period from 01 oct 2025 to 30 sep 2026
Supply of veg fresh at supply depot delhi cantt and its delivery points for period from 01 oct 2025 to 30 sep 2026
Read moreLaying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Laying of paver blocks from mohada dafaai from achhelals house via baigan basti and basor mohalla to st. joseph till the main road of tyagi hotel and naman agency at ward no 6
Read moreConstruction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Read moreof your Industry type