Tender Details
About Tender
🚂 Procurement Opportunity For Railway Infrastructure Projects 🛠️ The Ministry Of Railways, Central Government, Invites Bids For Two Critical Infrastructure Projects Under The Nagpur Division Of South East Central Railway (Secr): 1. Installation Of A Sliding Boom At 08 Lc Gates 🚪 Location: Nagpur Division, Secr 2. Signaling Requirements For The Kalamna Kanhan Jn. (Up Loop) Project 🚦 Total Work Length: 2.133 Tkm (Line No.9, 10, And 11 Of Kalamna Yard) Bid Submission Deadline: July 03, 2024, 3:00 Pm Earnest Money Deposit (Emd): Inr 6,12,000 Interested Bidders Should Review The Complete Tender Document For Detailed Specifications, Project Scope, And Submission Guidelines. Keywords: Ministry Of Railways, Railway Infrastructure, Sliding Boom, Signaling, Nagpur Division, South East Central Railway, Tender, Bid, EmdParticulars | Details |
---|---|
Title |
(1) Provision Of Sliding Boom At 08 Lc Gates In Nagpur Division Over Secr. (2) ) Signaling Requirement In Connection With The Work Kalamna Kanhan Jn. (Up Loop) Ctr(s/P) 2.133 Tkm (Line No.9,10 And 11 Of Kalamna Yard)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75547037 |
Reference Number |
ST-08LC-CTR-2-133-24 |
Tender Fee | 0 |
EMD | 61200 |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75547037/viewNitPdf_4597899.pdf |
Start Date | June 07, 2024 22:40 |
End Date |
03/07/2024 ( Expired 293 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Execution of signaling & telecommunication work in connection with: (1) bilaspur-durg: bilaspur - durg ctr(s) - 13.393 tkm & raipur - lakholi - ctr(s) - 18.659 tkm., (2) bilaspur-durg-ttr(cmsc)- 37 sets, ttr (tws)- 21 set & ttr (cs) - 41 sets, (3) construction of rub (fhs) at km 734/33-735/35a in lieu of manned level crossing no. 373 (belha yard) at km 734/25-27 between belha-dagori section in howrah-mumbai main line on cost sharing basis, (4) construction of rub in lieu of lc no.
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge on davha sayki road lc no 08 on btbr urr section along with service road drains etc in yard adjoining to rob in connection with the wcl at mkd iii of nagpur division of c rly in the state of maharashtra span 1 x 36 m
Construction of road over bridge on davha sayki road lc no 08 on btbr urr section along with service road drains etc in yard adjoining to rob in connection with the wcl at mkd iii of nagpur division of c rly in the state of maharashtra span 1 x 36 m
Read moreSw-i:- mysuru jn.- hole narsipur (sl) - trr(p) - 29.575 tkm ( km.55/850 - 67/350 & 68/325-86/400) sw-ii:- mys-y - trr(p) -7.175 km, km.130.45 - km.135.7 dn line, km.128.9 - km.130 & km.135.7 to km.136.525 up line sw-iii:- mysuru - yeliyur - ctr(p) - 2.150 tkm (km.136/525 - km. 137/600 up -1.075 tkm & dn - 1.075 tkm) sw-iv:- aden/mys:- isd on loop lines - ap -rd1& 3, kdo -rd1& 3, ntw -rd1& 3, cmnr -rd1& 3 , bdrl rd1&4, panp rd1&4, nhy rd1&4, blga rd1&
For complete deion and other details, please refer to tender
Read moreSignal &telecom works (indoor and outdoor) in connection with (i) yard remodeling of anara i.e. provision of 3 new lines (line no.- 7, 8 & 9) and extension of line no.- 2,3 & 4 by shifting of cross over towards bga end to get full csl in dn yard.(ii) dismantling up and dn main line cross over at both ends to eliminate the facility of dn main cum up loop by provision of up loop line as common loop at bishnupur station with reception facility from gokulnagar. and (iii) development o
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works, in connection with following works: (a) extension of up loop line to achieve 753 m csr at kurum station. (b) construction of track machine siding at kurum station. (c)provision of foot over bridge (fob) with ramp at biswa bridge station. (d) elimination of manned lcs by providing subway of size 5.0x4.5m by push through method in lieu of lc nos. 03, 04 & 10 between badnera-narkhed section.
For complete deion and other details, please refer to tender
Read more(1) provision of sliding boom at 08 lc gates in nagpur division over secr. (2) ) signaling requirement in connection with the work kalamna - kanhan jn. (up loop) - ctr(s/p) - 2.133 tkm (line no.9,10 and 11 of kalamna yard)
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works, in connection with following works: (a) extension of up loop line to achieve 753 m csr at kurum station. (b) construction of track machine siding at kurum station. (c)provision of foot over bridge (fob) with ramp at biswa bridge station. (d) provision of 25 kv/240v, 25 kva at supply for work of replacement of indoor interlocking signaling gears by electronic interlocking (ei) at paras station. (e) eliminat
For complete deion and other details, please refer to tender
Read moreAhmedabad -geratpur & ahmedabad-chandlodiya-khodiyar- mahesana : ctr (p) 60 kg by pqrs 12.604 km(adi-vg & adi_khd) , trr (p) 60 kg 3.504 km(adi-vg & adi-khd) & tbr 17.20 km(ger-adi) , ttr of pt no 202/c in torrent siding in railwy boundary with overhouling of lc no 1/eph ,trr(p) 60 kg of br no 21& 22a of cldy-khd section and track work in connection with provision of parcel loading line by extending dead end of line no and modification in south reception and dispatch yard
For complete deion and other details, please refer to tender
Read moreAhmedabad -geratpur & ahmedabad-chandlodiya-khodiyar- mahesana : ctr (p) 60 kg by pqrs 12.604 km(adi-vg & adi_khd) , trr (p) 60 kg 3.504 km(adi-vg & adi-khd) & tbr 17.20 km(ger-adi) , ttr of pt no 202/c in torrent siding in railwy boundary with overhouling of lc no 1/eph ,trr(p) 60 kg of br no 21& 22a of cldy-khd section and track work in connection with provision of parcel loading line by extending dead end of line no and modification in south reception and dispatch yard
For complete deion and other details, please refer to tender
Read moreSignalling portion of work in connection with 1.ttr(twswcms)-66 sets. ttr(tsr)-39 sets, sej-04 sets & glued joints-73 nos between koraput - singapur road - vizianagaram. 2.ctr(s) - 11.161 tkm between singapur road - vizianagaram (loop lines). 3.trr(p) - 4.319 tkm between singapur road - vizianagaram jn. (dn). 4.ctr(p) - 1.723 tkm between singapur road - vizianagaram (up & dn). 5.trr(p) - 1.515 km between rul - llgm stations on k.r.line of wat divn. 6.trr(p) - 1.396 km between bgua - l
For complete deion and other details, please refer to tender
Read moreof your Industry type