Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Community Toilet With Stair At Duburia Kendgoria
|
| Description |
Construction Of Community Toilet With Stair At Duburia Kendgoria
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2025_ZPHD_867554_1 |
|
Reference Number |
4/KGP/2025-26(2nd CALL) SL NO -01 |
| Tender Fee | 800 |
| EMD | 3600 |
| Tender Value | - |
| Place | DUBURIA |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1950228 |
| Start Date | June 21, 2025 14:40 |
| End Date |
Expired
28/06/2025
Expired 464 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreConstruction of community toilet with stair at duburia kend goria
Construction of community toilet with stair at duburia kend goria
Read moreConstruction of community level leach pit with silt chember at duburia kendgoria near bat tola mouza- duburia
Construction of community level leach pit with silt chember at duburia kendgoria near bat tola mouza- duburia
Read moreCommunity toilet at duburia near durga mandir
Community toilet at duburia near durga mandir
Read moreConstruction of community level leach pit with silt chember at duburia pry.school mouza- duburia,
Construction of community level leach pit with silt chember at duburia pry.school mouza- duburia,
Read moreConstruction of community toilet with stair at anandapur teli bundh
Construction of community toilet with stair at anandapur teli bundh
Read moreConstruction of community toilet with stair at kansai kamalia pond
Construction of community toilet with stair at kansai kamalia pond
Read moreConstruction of community toilet with stair at pairasole kanjir pukur
Construction of community toilet with stair at pairasole kanjir pukur
Read moreof your Industry type