Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rcc Underground Pipeline Laying Works
|
| Description |
Laying And Jointing Of Rcc Ugpl, Fixing Of Arv, Aav, Gv/Sluice Valves, Construction Of Haus And All Other Allied Works
|
| Organisation | Department of Agriculture | State Govt. and UT |
| Tender Id | 2025_DOA_139609_1 |
|
Reference Number |
DSWC/DSCO/SGR/UGPL/2025-26/06 |
| Tender Fee | 7900 |
| EMD | 1.5 Lakh |
| Tender Value | - |
| Place | Sangrur |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=285795 |
| Start Date | May 22, 2025 22:40 |
| End Date |
Expired
29/05/2025
Expired 493 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreRcc underground pipeline laying works
Laying and jointing of rcc underground pipeline work, fixing of arv, aav, gv and construction of haus and all other allied works
Read moreRcc underground pipeline laying works
Laying and jointing of rcc ugpl, fixing of arv, aav, gv/sluice valve and construction of haus and all other allied works.
Read moreRcc underground pipeline laying works
Laying and jointing of rcc ugpl, fixing of arv, aav, gv/sluice valve and construction of haus and all other allied works
Read moreRcc underground pipeline laying works
Laying and jointing of rcc ugpl, fixing of aav, arv, gv/sluice valve and construction of haus and all other allied works
Read moreRcc underground pipeline laying works
Laying and jointing of rcc ugpl, fixing of arv, aav, gv/sluice valve, construction of haus and all other allied works
Read moreRcc underground pipeline laying works
Laying and jointing of rcc ugpl, fixing of arv, aav, gv/sluice valve, construction of haus and all other allied works.
Read moreRcc underground pipeline laying works
Laying and jointing of rcc underground pipeline, fixing of arv, aav, gv/sluice valves, construction of haus and all other allied works.
Read moreRcc underground pipeline laying works
Laying and jointing of rcc ugpl, fixing of arv, aav, gv/sluice valve, construction of haus and all other allied works.
Read moreof your Industry type