Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
In Npp Area At Diffrent Diffrent Ward Pipe Line Extended Work
|
| Description |
In Npp Area At Diffrent Diffrent Ward Pipe Line Extended Work
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_DOLBU_859133_1 |
|
Reference Number |
875/NPP-2023 DATE- 26/10/2023 |
| Tender Fee | 3900 |
| EMD | 65500 |
| Tender Value | - |
| Place | NPP BELA PRATAPGARH |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | November 03, 2023 19:30 |
| End Date |
Expired
20/11/2023
Expired 1038 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreUpgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.
Upgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreIn all npp area in diffrent wards pipe line laying work
In all npp area in diffrent wards pipe line laying work
Read moreIn npp bela pratapgarh area at diffrent diffrent place boundery wall work
In npp bela pratapgarh area at diffrent diffrent place boundery wall work
Read moreProviding ,lowering,laying pipe line at amrai ward at diffrent places
Pipe provision and laying as per estimate
Read moreof your Industry type