Title
Repair And Maintenance Works On Damaged Sections Of 4 Lane Elevated Corridor In Deesa Town Between Km 565.85 To Km 569.60 (Length 3.75 Km) On East West Corridor Of Nh 27 (Old Nh 14) In Gujarat On Item Rate (Percentage) Basis At Risk And Cost Of Contr
Description
Repair And Maintenance Works On Damaged Sections Of 4 Lane Elevated Corridor In Deesa Town Between Km 565.85 To Km 569.60 (Length 3.75 Km) On East West Corridor Of Nh 27 (Old Nh 14) In Gujarat On Item Rate (Percentage) Basis At Risk And Cost Of Contr
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_233619_1
Reference
Number
NHAI/ROGNR/NH-27/Deesa/RC/2025
Tender Fee 10000
EMD 9.8 Lakh
Tender Value
Place NHAI, Regional Office, Gandhinagar
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=264336

Start Date April 25, 2025 00:00
End Date
Expired 26/05/2025

Expired 387 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor

Capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor

Read more
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor

Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor

Read more
Maintenance of 4 lane elevated corridor in deesa town km.565.850 to km. 569.600 (length 3.750 km) of nh-27 in the state of gujarat.

Maintenance of 4 lane elevated corridor in deesa town km.565.850 to km. 569.600 (length 3.750 km) of nh-27 in the state of gujarat.

Read more
Strengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba

Strengthening and overlay on damaged sections of six lane ahmedabad to vadodara section of nh 48 (old nh-8) from km. 6.400 to km. 108.700 (length 102.300 km) in the state of gujarat at risk and cost of concessionaire on single percentage item rate ba

Read more
Repair and maintenance works on damaged sections of 4-lane ahmedabad-godhra section of nh-47 from km 60.00 to km 105.00 (length 45.0 km) in the state of gujarat on item rate (percentage) basis at the risk and cost of contractor

Repair and maintenance works on damaged sections of 4-lane ahmedabad-godhra section of nh-47 from km 60.00 to km 105.00 (length 45.0 km) in the state of gujarat on item rate (percentage) basis at the risk and cost of contractor

Read more
Balance work of six laning of shamlaji-motachiloda from km. 401.200 to km.494.410 section (design chainage km.447.385 to km. 540.595 length - 93.210 km) of old nh-8 (nh-48) in the state of gujarat on single percentage item rate contract.

Balance work of six laning of shamlaji-motachiloda from km. 401.200 to km.494.410 section (design chainage km.447.385 to km. 540.595 length - 93.210 km) of old nh-8 (nh-48) in the state of gujarat on single percentage item rate contract.

Read more
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o

Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o

Read more
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o

Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o

Read more
Construction of 4 lane elevated corridor of kalimandir-dimna chowk-baliguma (jamshedpur) section of nh-33 (new nh-18) (from km 241.940 to km 251.961) (length 10.021 km) under nh(o) on epc mode in jharkhand

Construction of 4 lane elevated corridor of kalimandir-dimna chowk-baliguma (jamshedpur) section of nh-33 (new nh-18) (from km 241.940 to km 251.961) (length 10.021 km) under nh(o) on epc mode in jharkhand

Read more
Strengthening and overlay on pindwara udaipur section from km 692.00 to km 765.000 of nh 27 (from km 0.000 to km 73.000 of old nh 76) in the state of rajasthan on item rate (percentage) basis

Strengthening and overlay on pindwara udaipur section from km 692.00 to km 765.000 of nh 27 (from km 0.000 to km 73.000 of old nh 76) in the state of rajasthan on item rate (percentage) basis

Read more