Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Rectification Work Under Risk And Cost For Rehabilitation And Up Gradation Of Nh 361 F Of Section Kharwandi Navgaon Rajuri Ch Km 00 00 To Km 36 900 Two Lane Lane With Paved Shoulder Configuration
|
| Description |
Maintenance Rectification Work Under Risk And Cost For Rehabilitation And Up Gradation Of Nh 361 F Of Section Kharwandi Navgaon Rajuri Ch Km 00 00 To Km 36 900 Two Lane Lane With Paved Shoulder Configuration
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_873462_1 |
|
Reference Number |
EENHD/Chh.S./Tender/NIT No-5/ 4000170 |
| Tender Fee | 10000 |
| EMD | 8.75 Lakh |
| Tender Value | - |
| Place | Chhatrapati Sambhajinagar |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=918193 |
| Start Date | August 15, 2025 00:25 |
| End Date |
Expired
14/10/2025
Expired 366 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreBalance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Balance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Read moreConsultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Read moreUpgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type