Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Rcc Box Culvert Bridge At Km 146/8 9 Km 148/2 3 Km 152/8 9 Km 285/2 3 Km 55/0 1 And Protection Work At Km 152/1 4 And Slope Stablisation / Pitching Work And Other Protection Work At Breaches Locations In Rkb Jsm Section
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78990052 |
Reference Number |
147of2024-25 |
Tender Fee | 0 |
EMD | 4.47 Lakh |
Tender Value | |
Place | Jaipur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78990052/viewNitPdf_4804692.pdf |
Start Date | January 01, 2025 00:36 |
End Date |
29/01/2025 ( Expired 160 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair work of plant godown no.-1, no.-2,no.-3,godown no.4,no.5,no.-6,no.-7,no.-8, no.-9,no.-10,no.-11,no.-12 and const.of boundary wall with gate i/c insttalation of sign board, const.of drain and cc road with culvert of markfed at govindpura,bhopal
Repair work of plant godown no.-1, no.-2,no.-3,godown no.4,no.5,no.-6,no.-7,no.-8, no.-9,no.-10,no.-11,no.-12 and const.of boundary wall with gate i/c insttalation of sign board, const.of drain and cc road with culvert of markfed at govindpura,bhopal
Read moreBuilding and structural works for ips-1&2, sv-1, sv-2, sv-3, sv-4, sv-5, sv-6, sv-7, sv-8, sv-9, sv-10 & sv-11 of khpl
Civil and structural works for khpl project building and structural works for ips-1&2, sv-1, sv-2, sv-3, sv-4, sv-5, sv-6, sv-7, sv-8, sv-9, sv-10 & sv-11 of khpl as per scope of work/tender conditions.
Read moreDevelopment of road during the year 2025_26_sh_ fdr_mtc. of road from narayanpur bazar to sripally _sh_construction of 2 nos. box culvert at ch.1.00 km and 1.10 km, protection work and other allied works.
Development of road during the year 2025_26_sh_ fdr_mtc. of road from narayanpur bazar to sripally _sh_construction of 2 nos. box culvert at ch.1.00 km and 1.10 km, protection work and other allied works.
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreImprovement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Improvement of road from gokulnagar panchayet office to nh 208 under kumarghat rd block l 1 550 km under pwd r and b division kumarghat sh widening gsb wbm 2 wbm 3 carpeting road side drain cd including protection work etc fatikroy assembly
Read moreRasipuram municipality -name of work - construction of storm water drain and culvert at v.nagar road no.1 cross - 3-053007r177 v.nagar road no-7 cross 3-053008r468 v.nagar road no.1 cross - 1-053007r175,v.nagar road no.1 cross - 2-053007r176 v. naga
Name of work - construction of storm water drain and culvert at v.nagar road no.1 cross - 3-053007r177 v.nagar road no-7 cross 3-053008r468 v.nagar road no.1 cross - 1-053007r175,v.nagar road no.1 cross - 2-053007r176 v. nagar road 19-053008r208 v.n
Read moreProtection and road safety work on garinda to rinu km. 0/600 to 1/00 and 2/600 to 3/00
Protection and road safety work on garinda to rinu km. 0/600 to 1/00 and 2/600 to 3/00
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreConstruction of earthwork and lining of km 5 and 6 of minor no.47 (babhali dy.) at rd 37700 m and minor no.1, 2, 3, 4, 5,6, 7 and 8 at rd 1100, 1360, 2770, 3020, 4290, 5110 and 5685m of babhali dy on kayadhu branch canal
Construction of earthwork and lining of km 5 and 6 of minor no.47 (babhali dy.) at rd 37700 m and minor no.1, 2, 3, 4, 5,6, 7 and 8 at rd 1100, 1360, 2770, 3020, 4290, 5110 and 5685m of babhali dy on kayadhu branch canal
Read moreof your Industry type