Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply & Installation Of V Mware V Sphere 8 Standard Or Latest Edition,Supply & Installation Of V Mwar
|
| Description |
|
| Organisation | Department of Space | Department of Space |
| Tender Id | GEM/2023/B/4314777 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | December 14, 2023 22:13 |
| End Date |
Expired
04/01/2024
Expired 1011 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Conceptualizing, designing, fabrication and setting up of the 14th edition of india chem 2026 during 22nd to 24th october 2026 at the bombay exhibition centre with the theme- advantage bharat, an emerging global chemical hub
Conceptualizing, designing, fabrication and setting up of the 14th edition of india chem 2026 during 22nd to 24th october 2026 at the bombay exhibition centre with the theme- advantage bharat, an emerging global chemical hub
Read moreTggenco-procurement of aluminium sulphate , octadecahydrate (alumino-ferric, grade-4)(as per is-299:2012 (reaffirmed 2022)) in new 25kg standard hdpe bags required for ytps/stage-i of tggenco
Tggenco-procurement of aluminium sulphate , octadecahydrate (alumino-ferric, grade-4)(as per is-299:2012 (reaffirmed 2022)) in new 25kg standard hdpe bags required for ytps/stage-i of tggenco
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreof your Industry type