Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing C.C Road From Gaddikayyalu 1st Cross Road To Srinivasa Hall Main Road Beside Electrical Sub Station In Division No.5
|
| Description |
Providing C.C Road From Gaddikayyalu 1st Cross Road To Srinivasa Hall Main Road Beside Electrical Sub Station In Division No.5
|
| Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
| Tender Id | 841055 |
|
Reference Number |
798/2025-26, Dt.2.9.2025 |
| Tender Fee | 612 |
| EMD | 17267 |
| Tender Value | |
| Place | AP |
| Link |
View Original Tender Notice
https://tender.apeprocurement.gov.in |
| Start Date | September 02, 2025 22:30 |
| End Date |
Expired
16/09/2025
Expired 286 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting/dismantling of electrical lines which are creating hurdles in road widening from nandpuri underpass (80 ft road) to main road (100 ft), zone-c, jaipur
Shifting/dismantling of electrical lines which are creating hurdles in road widening from nandpuri underpass (80 ft road) to main road (100 ft), zone-c, jaipur
Read moreShifting/dismantling of electrical lines which are creating hurdles in road widening from nandpuri underpass (80 ft road) to main road (100 ft), zone-c, jaipur.
Shifting/dismantling of electrical lines which are creating hurdles in road widening from nandpuri underpass (80 ft road) to main road (100 ft), zone-c, jaipur.
Read moreProviding pipeline extn at anna nagar main road and vivekanandha street in ward no 14
Providing pipeline extn at anna nagar main road and vivekanandha street in ward no 14
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreImp./dev. of road from h.no.i-1 to i-5, h-1 to h-4 and j-1 to j-7 in aruna nagar by providing rmc in ward no. 73, civil lines, city-sp zone.
Imp./dev. of road from h.no.i-1 to i-5, h-1 to h-4 and j-1 to j-7 in aruna nagar by providing rmc in ward no. 73, civil lines, city-sp zone.
Read moreOnstruction of an interlocking road from the shikarpur main road to neeru plot in village bagrai, block arniya
Onstruction of an interlocking road from the shikarpur main road to neeru plot in village bagrai, block arniya
Read moreIn the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
Read moreUrgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027. sl-03
Urgent repair works 1.00 kmp to 1.500 kmp in patches tengua-basulichak road under haldia construction sub-division no-i in the district of purba medinipur in the year 2026-2027.
Read moreProviding storm water drain and culvert at anna nagar main road (080017r257), anna nagar north road (080017r260) and vinayagar kovil road (080017r264) ward no 17 in palani municipality
Providing storm water drain and culvert at anna nagar main road (080017r257), anna nagar north road (080017r260) and vinayagar kovil road (080017r264) ward no 17 in palani municipality
Read moreProvn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Provn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Read moreof your Industry type