Supplying And Spreading Of Hbgs Jelly Over Crushed Stone Sand In 11 Kv Feeder Lv Breaker Capacitor Bank Yard Side And 11 Kv Side At 110 Kv Ambur Substation Pallikonda Division In Tirupattur Edc
|
Description |
Supplying And Spreading Of Hbgs Jelly Over Crushed Stone Sand In 11 Kv Feeder Lv Breaker Capacitor Bank Yard Side And 11 Kv Side At 110 Kv Ambur Substation Pallikonda Division In Tirupattur Edc
|
Organisation | Government of Tamil Nadu |
Tender Id | 2024_EB_406094_1 |
Reference Number |
TS.No C.31/2023-2024 |
Tender Fee | 0 |
EMD | 3128 |
Tender Value | |
Place | SE/TEDC/TIRUPATTUR |
Link | https://tntenders.gov.in |
Start Date | January 04, 2024 23:00 |
End Date |
10/01/2024 ( Expired 514 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supplying laying and spreading of crushed stone over a layer of cement,sand,and brick khoa mix and other associated works at lv side portion switchyard of 3rd 31.5 mva transformer at new bishnupur 220 kv substation under bankura area office,wbsetcl
Supplying laying and spreading of crushed stone over a layer of cement,sand,and brick khoa mix and other associated works at lv side portion switchyard of 3rd 31.5 mva transformer at new bishnupur 220 kv substation under bankura area office,wbsetcl
Read moreAiho bridge over river tangon at 13th km of malda bulbulchandi road, rehabilitation of both side approach slab with abutment wall portion and other allied works under malda highway division in the district of malda.
Aiho bridge over river tangon at 13th km of malda bulbulchandi road, rehabilitation of both side approach slab with abutment wall portion and other allied works under malda highway division in the district of malda.
Read moreInstallation of 3.3 kv, 300kvar capacitor bank with control panels and shed foundation and connected to the 2.5 mva secondary side switch of 11kv/3.3kv main substation jocp under hazaribag area
Installation of 3.3 kv, 300kvar capacitor bank with control panels and shed foundation and connected to the 2.5 mva secondary side switch of 11kv/3.3kv main substation jocp under hazaribag area
Read moreWorks contract for the provision of new earth pit with earth mat in 110kv chidambaram ss in cuddalore edc
Works contract for the provision of 39 nos of new earth pit with earth mat in 110kv 33kv and 11kv sides in parallel to existing earth mat at 110kv chidambaram ss in cuddalore edc
Read moreImprovement works by supplying and filling of 20mm hard broken granite stone jelly (hbgs) for the 11kv switch yard area at sholavanthan 110/11kv sub-station pertaining to samayanallur division
Improvement works by supplying and filling of 20mm hard broken granite stone jelly (hbgs) for the 11kv switch yard area at sholavanthan 110/11kv sub-station pertaining to samayanallur division
Read moreSupplylaying and spreading of crushed stone over a layer of cement, sand jhama mix with land developing and other allied works at 33 kv switch yard portion and others civil work at newtown aa- iii 220/132/33 kv sub-station wbsetcl
Supplylaying and spreading of crushed stone over a layer of cement, sand jhama mix with land developing and other allied works at 33 kv switch yard portion and others civil work at newtown aa- iii 220/132/33 kv sub-station wbsetcl
Read moreExtraction/dismantling of pvc xlpe cable from different places of yard trench and laying same in trench for feeding power to newly installed capacitor bank with apfc panel at madhuban d.g sub-station under block-ii area
Extraction/dismantling of pvc xlpe cable from different places of yard trench and laying same in trench for feeding power to newly installed capacitor bank with apfc panel at madhuban d.g sub-station under block-ii area
Read moreSupplying and fixing stainless steel handrail to the foot path portion both side at valluvarkottam high road (from jn of tank bund road to krishna street) in division-113, unit-26, zone-09
Supplying and fixing stainless steel handrail to the foot path portion both side at valluvarkottam high road (from jn of tank bund road to krishna street) in division-113, unit-26, zone-09
Read moreErection of thatipally ss
Erection of 33/11kv substation at thatipally (v) in sirikonda (m) of dichpally division of nizamabad circle under t and d/ si scheme on partial turnkey basis.
Read moreErection of shanthinagar ss