Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design And Construction Of Elevated Road From Fountain Hotel Junction At Thane Ghodbunder Road To Bhayander
|
| Description |
Design And Construction Of Elevated Road From Fountain Hotel Junction At Thane Ghodbunder Road To Bhayander
|
| Organisation | Mumbai Metropolitan Region Development Authority | State Govt. and UT |
| Tender Id | 2024_MMRDA_1061522_1 |
|
Reference Number |
MMRDA/Elevated/Fountain Hotel Thane to Bhayander/2024 |
| Tender Fee | 1 Lakh |
| EMD | 2.85 Crore |
| Tender Value | - |
| Place | Thane |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1852917 |
| Start Date | July 30, 2024 18:55 |
| End Date |
Expired
19/09/2024
Expired 708 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreConstruction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreMaintenance of road from approach road connecting rajwal from sh156 junction (mdr) road from km. 0.00 to 2.54 in jewargi taluka dist. kalaburagi under 3054-mdr road maintenancefor the year 2026-27
Maintenance of road from approach road connecting rajwal from sh156 junction (mdr) road from km. 0.00 to 2.54 in jewargi taluka dist. kalaburagi under 3054-mdr road maintenancefor the year 2026-27
Read moreMaintenance of road lakshmipura junction to taraka main road via motha from ch 0.00 to 4.88km in h.d.kote taluk, mysuru district.
Maintenance of road lakshmipura junction to taraka main road via motha from ch 0.00 to 4.88km in h.d.kote taluk, mysuru district.
Read moreAnnual maintenance of eshwaragere to ranganathapura junction road via kudlahalli, doddakatte, uppalagere road from km 0.00 to 6.61 and 8.46 to 10.00 km in hiriyur taluk
Annual maintenance of eshwaragere to ranganathapura junction road via kudlahalli, doddakatte, uppalagere road from km 0.00 to 6.61 and 8.46 to 10.00 km in hiriyur taluk
Read moreRoad development work in kollegal taluk srirangapattana-malaimahadeshwara hills road state highway-79 chain from 68.70 to 69.61 kms ( dasanapura junction to n h -948 connecting road (near animal department office))
Road development work in kollegal taluk srirangapattana-malaimahadeshwara hills road state highway-79 chain from 68.70 to 69.61 kms ( dasanapura junction to n h -948 connecting road (near animal department office))
Read moreDesign and construction of underground road tunnel from gaimukh to fountain hotel junction on thane ghodbunder road
Design and construction of underground road tunnel from gaimukh to fountain hotel junction on thane ghodbunder road
Read moreConstruction of road over bridge with solid ramps at anand nagar junction on ghodbunder road thane
Construction of road over bridge with solid ramps at anand nagar junction on ghodbunder road thane
Read moreof your Industry type