Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bridge Along With Approach Road On River Tungi Under Nowda Block In The District Of Murshidabad
|
| Description |
Construction Of Bridge Along With Approach Road On River Tungi Under Nowda Block In The District Of Murshidabad Under Ridf Xxviii Bridges (Length Of The Road 76.12 Mtr.)
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_PRD_579401_1 |
|
Reference Number |
14/RIDFXXVIII/MSD/BRIDGE/ SE/RRNMU/23-24_4th Call |
| Tender Fee | 0 |
| EMD | 10 Lakh |
| Tender Value | |
| Place | MALDA |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 29, 2023 16:30 |
| End Date |
Expired
10/11/2023
Expired 958 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bridge over river kali, approach road and protection work at village jhanda musharrafpur road to saidpur road in district hapur
Construction of bridge over river kali, approach road and protection work at village jhanda musharrafpur road to saidpur road in district hapur
Read moreConstruction of bridge over river bansi at pipra gola ghat in district kushinagar
Construction of bridge over river bansi at pipra gola ghat in district kushinagar
Read moreConstruction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreEmergent maintenance work of the existing road of the project construction of 4 lane bridge over irang river on imphal jiribam road section 95.5 km nh 37 at the risk and cost of the epc contractor on percentage rate and work order basis 2nd call
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreConstruction of seismic stations, approach roads, and associated infrastructure in the technical area of rrcat, indore.
Construction of seismic stations, approach roads, and associated infrastructure in the technical area of rrcat, indore.
Read moreof your Industry type