Tender Details
Particulars | Details |
---|---|
Title |
Welcome Maintenance To Officers Md Accn In West End And Polo View Of North Complex Under Age B/R Ii At Ima Dehradun
|
Description |
Welcome Maintenance To Officers Md Accn In West End And Polo View Of North Complex Under Age B/R Ii At Ima Dehradun
|
Organisation | E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 98000 |
Tender Value | |
Place | GE IMA Dehradun |
Link |
AAAAAAAAAA Login to view |
Start Date | April 19, 2025 14:30 |
End Date |
26/04/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreRepair/replacement of internal wiring and allied works at jcos/or md accn and otm accn in upper garrison at yol cantt under age e/m of ge (kh) yol
Repair/replacement of internal wiring and allied works at jcos/or md accn and otm accn in upper garrison at yol cantt under age e/m of ge (kh) yol
Read moreSoil investigation and structural design in r o provn of deficient married accn at af stn dinjan under ge af mohanbari
Soil investigation and structural design in r o provn of deficient married accn at af stn dinjan under ge af mohanbari
Read moreComprehensive repair to roof, false ceiling, joinery, plastering, connecting pavement, plumbing, aluminium partition and connected works in 27 camp and 28 camp at yol cantt under age br-i of ge (kh) yol
Comprehensive repair to roof, false ceiling, joinery, plastering, connecting pavement, plumbing, aluminium partition and connected works in 27 camp and 28 camp at yol cantt under age br-i of ge (kh) yol
Read moreDeployment of contract labours to attend day to day petty maintenance works related to masonry carpentry finishing works in quarter and public buildings under north zone at btps dvc bokaro
Deployment of contract labours to attend day to day petty maintenance works related to masonry carpentry finishing works in quarter and public buildings under north zone at btps dvc bokaro
Read moreof your Industry type