Tender Details

About Tender

🏗️ Invitation For Bids: 11/0.4 Kv Lt Protection Works 🏘️ Dakshinanchal Vidyut Vitaran Nigam Ltd., A State Government Undertaking, Invites Bids From Reputable Contractors For The Execution Of 11/0.4 Kv Lt Protection Works Under The Business Plan 2024 25 In The Area Of Edc Ii, Mathura, On A Turnkey Basis. 📅 Bid Submission Deadline: 21/05/2024, 12:00 Pm Tender Fee: Inr 5900 Emd: Inr 345000 Interested Bidders Should Possess The Necessary Qualifications And Experience In Electrical Infrastructure Projects. Proposals Must Include Detailed Project Plans, Cost Estimates, And Timelines For Completion. Keywords: 11/0.4 Kv Lt Protection Works, Electrical Infrastructure, Turnkey Project, Dakshinanchal Vidyut Vitaran Nigam Ltd., State Govt. And Ut, Bid, Mathura, Tender, Emd, Tender Fee
Particulars Details
Title
11/0.4 Kv Lt Protection Works Under Business Plan 2024 25 In The Area Of Edc Ii, Mathura On Turnkey Basis.
Description
11/0.4 Kv Lt Protection Works Under Business Plan 2024 25 In The Area Of Edc Ii, Mathura On Turnkey Basis.
Organisation Dakshinanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2024_DVVNL_922123_1
Reference
Number
98/EDC-II(M)/2023-24
Tender Fee 5900
EMD 3.45 Lakh
Tender Value -
Place Mathura
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1597286

Start Date May 15, 2024 21:30
End Date
Expired 21/05/2024

Expired 873 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, begusarai, darbhanga, saharsa, kishanganj and purnea under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.

Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, begusarai, darbhanga, saharsa, kishanganj and purnea under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.

Read more
Supply,erection,testing and commissioning of lot 1 i) 2nd circuit stringing (15.2 km) on existing 132 kv jakora-kotagiri dc/sc line with 1st circuit live ii)1 no. 132 kv bay at 132/33 kv ss jakora (iii) 1no.132 kv bay at 132/33 kv ss kotagiri in nizamabad district and lot-ii 33 kv features with 2x50 mva ptr at existing at 220/132 kv ss kamareddy in kamareddy district on turnkey basis

Supply,erection,testing and commissioning of lot 1 i) 2nd circuit stringing (15.2 km) on existing 132 kv jakora-kotagiri dc/sc line with 1st circuit live ii)1 no. 132 kv bay at 132/33 kv ss jakora (iii) 1no.132 kv bay at 132/33 kv ss kotagiri in nizamabad district and lot-ii 33 kv features with 2x50 mva ptr at existing at 220/132 kv ss kamareddy in kamareddy district on turnkey basis

Read more
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis

Read more
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.

Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.

Read more
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis

Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Different 11 kv line and 100 kva tf protection works under business plan 2024-25 part-2 in the area of edc-ii, mathura on semi turnkey basis

Different 11 kv line and 100 kva tf protection works under business plan 2024-25 part-2 in the area of edc-ii, mathura on semi turnkey basis

Read more
33 kv substations/line erection/strengthening works under business plan 2024-25 in the area of edc ii, mathura on semi turnkey basis

33 kv substations/line erection/strengthening works under business plan 2024-25 in the area of edc ii, mathura on semi turnkey basis

Read more
11 kv vcb/line erection/strengthening works under business plan 2024-25 in the area of edc ii, mathura on semi turnkey basis.

11 kv vcb/line erection/strengthening works under business plan 2024-25 in the area of edc ii, mathura on semi turnkey basis.

Read more
Construction of new 11/0.4 kv substation, 33 kv under ground cable replacement work and capacity enhancement in additional business plan on semi turnkey basis under edc sambhal

Construction of new 11/0.4 kv substation, 33 kv under ground cable replacement work and capacity enhancement in additional business plan on semi turnkey basis under edc sambhal

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise