Tender Details
Particulars | Details |
---|---|
Title |
R.F.P. For Consultancy Services For Feasibility Study Cum Dpr, Survey And Preparation Of Land Plan For Widening To Two Lane With Paved Shoulders To Various Roads For Following Works In The State Of Maharashtra With Financial Aid Of A.D.B.(Under Epc)
|
Description |
R.F.P. For Consultancy Services For Feasibility Study Cum Dpr, Survey And Preparation Of Land Plan For Widening To Two Lane With Paved Shoulders To Various Roads For Following Works In The State Of Maharashtra With Financial Aid Of A.D.B.(Under Epc)
|
Organisation | Government of Maharashtra |
Tender Id | 2023_PWR_960030_1 |
Reference Number |
Ambajogai_PWD_16_2023_24 |
Tender Fee | 15075 |
EMD | 5 Lakh |
Tender Value | 0 |
Place | Executive Engineer P.W.D. Ambajogai |
Link | https://mahatenders.gov.in |
Start Date | November 04, 2023 19:30 |
End Date |
10/11/2023 ( Expired 528 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km
Consultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreRehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode
Rehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode.
Read moreDevelopment and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.
Development and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.
Read moreWidening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Widening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Read moreWidening to two lane paved shoulders from km 0.000 mudigere to km 26.326 mugutihalli of nh 173 mudigere kadur section in the state of karnataka on epc mode
Widening to two lane paved shoulders from km 0.000 mudigere to km 26.326 mugutihalli of nh 173 mudigere kadur section in the state of karnataka on epc mode
Read moreWidening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Read moreof your Industry type