Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Fresh Methi Gayatri Semi Phephada (Semi Bold Size) And Methi Gayatri Phephada (Bold Size Notified Seeds For Year 2025 26
|
Description |
Supply Of Fresh Methi Gayatri Semi Phephada (Semi Bold Size) And Methi Gayatri Phephada (Bold Size Notified Seeds For Year 2025 26.
|
Organisation | Head Office Mahabeej Akola | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1090 |
EMD | 1 Lakh |
Tender Value | |
Place | Head Office MSSCL Akola Maharashtra |
Link |
AAAAAAAAAA Login to view |
Start Date | March 29, 2025 23:25 |
End Date |
24/04/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewNotice inviting expression of interest eoi for registration of radiologist and firms for empanelment in tele radiology reporting panel
Read morePerpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreRfq-2025 for the maintenance works to be taken up on risk and cost of the concessionaire / contractor under ro-kolkata
Rfq-2025 for the maintenance works to be taken up on risk and cost of the concessionaire / contractor under ro-kolkata
Read moreHiring of latest model-2025 of 1 no. new petrol car (4plus1-seater) / equivalent or utilization period of petrol car up to 04 years or 1,50,000 kms. and registration in taxi quota for official/field use of se (eht-m) circle, mpptcl, jabalpur
Hiring of latest model-2025 of 1 no. new petrol car (4plus1-seater) / equivalent or utilization period of petrol car up to 04 years or 1,50,000 kms. and registration in taxi quota for official/field use of se (eht-m) circle, mpptcl, jabalpur
Read moreAAAAAAAAAA
Login to viewGap filling with hdpe pipe line raigaon jharna and repairing of damaged pipe line during construction of drain installation of valve and other allied works for zi to zv under jaigaon development authority jda under alipurduar division phe dte.
Read moreSupply of documentation for stall warning and protection system stick shaker and stick pusher
Supply of documentation for stall warning and protection system stick shaker and stick pusher
Read moreSupply, installation, testing and commissioning of e and m works for remodeling of baiyappanahalli depot under package 4 of bmrcl project ph 2a
Supply, installation, testing and commissioning of e and m works for remodeling of baiyappanahalli depot under package 4 of bmrcl project ph 2a
Read moreRequest for proposal for selection of system integrator (erpsi) for supply, installation, commissioning, implementation and support for enterprise resource planning (erp) system at power department sikkim
Request for proposal for selection of system integrator (erpsi) for supply, installation, commissioning, implementation and support for enterprise resource planning (erp) system at power department sikkim
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Read moreof your Industry type