Tender Details
Particulars | Details |
---|---|
Title |
Construction And Commissioning Of Solar Energy Based Bore Well Water Pumping Systems, With Storage Reservoir And Psp Including Five Years Defect Liability In Div. Deeg District Deeg
|
Description |
Construction And Commissioning Of Solar Energy Based Bore Well Water Pumping Systems, With Storage Reservoir And Psp Including Five Years Defect Liability In Div. Deeg District Deeg
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id | 2025_PHCJA_447133_1 |
Reference Number |
NIT NO 22/24-25 |
Tender Fee | 2000 |
EMD | 2.4 Lakh |
Tender Value | |
Place | Deeg |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=802768 |
Start Date | February 11, 2025 23:30 |
End Date |
19/02/2025 ( Expired 106 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDesign supply installation testing commissioning of 700 numbers of standalone solar water pumping systems including annual maintenance contract for 5 years at various locations in the state of goa
Design supply installation testing commissioning of 700 numbers of standalone solar water pumping systems including annual maintenance contract for 5 years at various locations in the state of goa
Read moreConstruction with 10 years operation and maintenance services of 24x7 drink from tap water supply scheme for golaghat town in assam
Construction with 10 years operation and maintenance services of 24x7 drink from tap water supply scheme for golaghat town in assam
Read moreSupply installation and commissioning of all- in- one hybrid solar street lights with octagonal pole as per rfp specifications with five year comprehensive maintenance for various locations across gorakhpur city. uttar pradesh
Supply installation and&#x0d commissioning of all- in- one hybrid solar street lights with octagonal pole as per rfp specifications with five&#x0d year comprehensive&#x0d maintenance for various&#x0d locations across gorakhpur&#x0d city. uttar pradesh
Read moreConstruction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Construction of rain water harvesting recharge well along with storage tank and connecting drain at hvdc station alipurduar
Read more05/25-26 - rate contract of drilling of 125mm nominal diameter bore hole for hand pumps and installation of india mark-ii hand pump in sandy strata complete with material and labour charges in div. dholpur of district dholpur (urban/rural).
Rate contract of drilling of 125mm nominal diameter bore hole for hand pumps and installation of india mark-ii hand pump in sandy strata complete with material and labour charges in div. dholpur of district dholpur (urban/rural).
Read more02/25-26 - construction and commissioning of 200mm dia three phase tube well on annual rate contract basis in combination strata including defect liability period of two years in urban/rural area of division dholpur district dholpur
Construction and commissioning of 200mm dia three phase tube well on annual rate contract basis in combination strata including defect liability period of two years in urban/rural area of division dholpur district dholpur
Read moreStrengthening of bodh chakki dhar road (ptkodr-1) km 0.000 to 1.163 in district pathankot including maintenance of road for 5 years (one year defect liability period and four year maintenance period)
Strengthening of bodh chakki dhar road (ptkodr-1) km 0.000 to 1.163 in district pathankot including maintenance of road for 5 years (one year defect liability period and four year maintenance period)
Read moreof your Industry type