Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Contruction Of Cc Lining Work Reach From 3.171 Km To 3.441 Km Of Total 370 Mtr In Main Canal Of Gurha Pump Canal At Gram Gurhakalan Block Naraini Distt Banda
|
| Description |
Contruction Of Cc Lining Work Reach From 3.171 Km To 3.441 Km Of Total 370 Mtr In Main Canal Of Gurha Pump Canal At Gram Gurhakalan Block Naraini Distt Banda
|
| Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
| Tender Id | 2025_UPIDM_1076144_1 |
|
Reference Number |
02/Lot 4/E.E./2025-26 |
| Tender Fee | 854 |
| EMD | 67500 |
| Tender Value | - |
| Place | Naraini, Banda |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1965763 |
| Start Date | September 22, 2025 16:30 |
| End Date |
Expired
03/10/2025
Expired 339 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of cc lining work reach from 1.500 km to 1.785 km of total 285 mtr in main canal of gurha pump canal gram gurhakalan block naraini distt banda
Construction of cc lining work reach from 1.500 km to 1.785 km of total 285 mtr in main canal of gurha pump canal gram gurhakalan block naraini distt banda
Read moreConstruction of cc lining work reach from 2.065 km to 2.340 km of total 275 mtr in main canal of gurha pump canal at gram gurhakalan block naraini distt banda
Construction of cc lining work reach from 2.065 km to 2.340 km of total 275 mtr in main canal of gurha pump canal at gram gurhakalan block naraini distt banda
Read moreConstruction of cc lining work reach from 2.625 km to 2.770 km and 2.776 km to 2.896 km of total 265 mtr in main canal of gurha pump canal at gram gurhakalan block naraini distt banda
Construction of cc lining work reach from 2.625 km to 2.770 km and 2.776 km to 2.896 km of total 265 mtr in main canal of gurha pump canal at gram gurhakalan block naraini distt banda
Read moreC.c. lining for kazipur pump canal block naraini district banda lot-1
C.c. lining for kazipur pump canal block naraini district banda lot-1
Read moreWidening and strengthening work of km 1 to 8-100- of the road ing from banda-naraini sh no-113 to banda-bisanda sh no-133 crossing nh-35 in banda district
Widening and strengthening work of km 1 to 8-100- of the road ing from banda-naraini sh no-113 to banda-bisanda sh no-133 crossing nh-35 in banda district
Read moreCanal renovation of tillari right bank canal km 1 to 27 and banda branch canal km 1 to 30 under canal rehabilitation and improvement programme of tillari interstate project
Canal renovation of tillari right bank canal km 1 to 27 and banda branch canal km 1 to 30 under canal rehabilitation and improvement programme of tillari interstate project
Read moreCanal renovation of tillari right bank canal km 1 to 27 and banda branch canal km 1 to 30 under canal rehabilitation and improvement programme of tillari interstate project
Canal renovation of tillari right bank canal km 1 to 27 and banda branch canal km 1 to 30 under canal rehabilitation and improvement programme of tillari interstate project
Read moreThermoplastic road signage and other road safety works from km 25 (870-1000) to km 59 of fatehpur baberu-atarra-naraini-kartal road in banda district.
Thermoplastic road signage and other road safety works from km 25 (870-1000) to km 59 of fatehpur baberu-atarra-naraini-kartal road in banda district.
Read moreRepairing of flag stone lining of badagaon main canal reach 0.50 km to 2nd vrb length 370 mtr at badagaon pump canal, jhansi
Repairing of flag stone lining of badagaon main canal reach 0.50 km to 2nd vrb length 370 mtr at badagaon pump canal, jhansi
Read moreErection of superstructure and lifting assembly, central drive unit of banda branch cross regulator at km 59.338 trijunction of tail of ken main canal, banda
Erection of superstructure and lifting assembly(rope drum hoist type), central drive unit of banda branch cross regulator at km 59.338 trijunction of tail of ken main canal, banda
Read moreof your Industry type