Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Mp Rbc 2023 24 Modernisation Of Cada Field Channel Urgent Rectification Works To Cada Channel Starting From Sluice 17/800 Km Of Rbmc General Civil Work
|
| Description |
The Proposed
Cada Was Meeting A Pipe Which Is Damaged
A N D A L W A Y S B L O C K E D D U R I N G W A T E R
Distribution.The Proposed Cada Is Along The Side
Of Poriyani High Way And The Area Get Water
Logged During Water D
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_618561_1 |
|
Reference Number |
IRR/PI/TR/5410/2023_5_1_1/1 |
| Tender Fee | 655 |
| EMD | 7404 |
| Tender Value | |
| Place | Head works sub division Malampuzha |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | November 02, 2023 23:00 |
| End Date |
Expired
09/11/2023
Expired 959 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General 2026-2027 -premonsoon work -cutting branches of trees/dangerous trees and allied works to various roads under road section pala.-civil work-general civil work
General 2026-2027 -premonsoon work -cutting branches of trees/dangerous trees and allied works to various roads under road section pala.-civil work-general civil work
Read moreGeneral-monsoon preparedness 2026- puthukudi thodu-temporary side protection works to house no. 464 in ward no. 5 on d/s side of puthukudi culvert at puthukudi in keezhallur panchayath in mattannur constituency, kannur district-general civil work-1
General-monsoon preparedness 2026- puthukudi thodu-temporary side protection works to house no. 464 in ward no. 5 on d/s side of puthukudi culvert at puthukudi in keezhallur panchayath in mattannur constituency, kannur district-general civil work-1
Read moreGeneral-mp- rbc-2023-24-modernisation of cada field channel -urgent works to cada from the ch 0/850 of puduppariyaram branch canal -general civil work
Field channel-urgent works to cada starting from the ch0/850 km of akathethara panchayath.the estimate is prepared for urgent rectification works to the cada channel.the present situation is that,the channel is not lined as a result te
Read moreGeneral mp rbc 2023-24 modernisation of cada field channel urgent rectification works to the field channel in between ch 0/000km to 0/100 km offtake at ch 0/031 km of pathiripapala branch canal general civil work
Demolishing,earth work,pcc 1 4 8 , pcc 1 3 6,pcc1 1.5 3,centring and shutering,re inforcement,
Read moreGeneral-mp -rbc-2023-24-modernisation of cada field channel -urgent rectification works to the field channel in b/w ch 0/000 km to 0/100 km offtake at ch 7/625 km of palappuram branch canal -general civil work
The work has been included under the plan fund for the modernisation of the field channels of the malampuzha project.the proposed field channel of palappuram branch canal have been constructed long years back. theside walls and foundation of
Read moreGeneral-cpp-mlbc-cada 2023-24-modernisation of tail end field channel of chenthony distributory-general civil work
Clearing grass demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 cc 1_1 5_3 centering and shuttering platering etc
Read moreGeneral cada 2023 24 mp lbc msmodernization of field channels renovation of field channel sluice no 11 ch.0.750km to 1.250 km of peringottukurissi canal. pnnikodu padasekharasamithi general civil work
General cada 2023 24 mp lbc msmodernization of field channels renovation of field channel sluice no 11 ch.0.750km to 1.250 km of peringottukurissi canal. pnnikodu padasekharasamithi general civil work
Read moreGeneral cpp mlbc cada 2023 24 modernisation of field channel from sluice no.39 (lhs) at ch 5/020 km of edayankulambu branch canal
General cpp mlbc cada 2023 24 modernisation of field channel from sluice no.39 (lhs) at ch 5/020 km of edayankulambu branch canal
Read moreGeneral cpp mlbc cada 2023 24 modernisation of field channel offtaking from kalyanapetta branch canal at ch3/500 km (sluice no 30)(second reach)
General cpp mlbc cada 2023 24 modernisation of field channel offtaking from kalyanapetta branch canal at ch3/500 km (sluice no 30)(second reach)
Read moreGeneral cpp mlbc cada 2023 24 modernisation of field channel offtaking from kalyanapetta branch canal at ch3/500 km (sluice no 30)(second reach)
General cpp mlbc cada 2023 24 modernisation of field channel offtaking from kalyanapetta branch canal at ch 3/500 km (sluice no 30)(second reach)
Read moreof your Industry type