Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Mp Rbc 2023 24 Modernisation Of Cada Field Channel Urgent Rectification Works To Cada Channel Starting From Sluice 17/800 Km Of Rbmc General Civil Work
|
| Description |
The Proposed
Cada Was Meeting A Pipe Which Is Damaged
A N D A L W A Y S B L O C K E D D U R I N G W A T E R
Distribution.The Proposed Cada Is Along The Side
Of Poriyani High Way And The Area Get Water
Logged During Water D
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_618561_1 |
|
Reference Number |
IRR/PI/TR/5410/2023_5_1_1/1 |
| Tender Fee | 655 |
| EMD | 7404 |
| Tender Value | - |
| Place | Head works sub division Malampuzha |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | November 02, 2023 23:00 |
| End Date |
Expired
09/11/2023
Expired 1051 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mp-rbc-cada work urgent rectification works to the cada channel b/w ch 0/200km to 0/500km ing from the sluice at ch 19/820km of rbmc
The provisions included in this estimate are&#x0d demolishing of concrete, earthwork excavation, cc&#x0d 1 4 8 using 40 mm for bed foundation,cc&#x0d 1 3 6 using 20 mm b stone for side walls, cc 1 2 4&#x0d using 20 mm b stone for wearing coat, rcc in&#x0d 1 1.5 3
Read moreGeneral-mp- rbc-2023-24-modernisation of cada field channel -urgent works to cada from the ch 0/850 of puduppariyaram branch canal -general civil work
Field channel-urgent works to cada starting from the ch0/850 km of akathethara panchayath.the estimate is prepared for urgent rectification works to the cada channel.the present situation is that,the channel is not lined as a result te
Read moreGeneral cada 2025 2026 cpp mlbc modernisation of field channel from sluice no 94 at ch 19 800 km of main canal general civil work 1
Clearing grassdemolishing cc earth workexacavation cc 1_4_8 cc 1_3_6cc 1_2 _4 cc 1_1 5_3 centering and shutteringplatering etc
Read moreGeneral mp rbc 2023-24 modernisation of cada field channel urgent rectification works to the field channel in between ch 0/000km to 0/100 km offtake at ch 0/031 km of pathiripapala branch canal general civil work
Demolishing,earth work,pcc 1 4 8 , pcc 1 3 6,pcc1 1.5 3,centring and shutering,re inforcement,
Read moreGeneral-mp -rbc-2023-24-modernisation of cada field channel -urgent rectification works to the field channel in b/w ch 0/000 km to 0/100 km offtake at ch 7/625 km of palappuram branch canal -general civil work
The work has been included under the plan fund for the modernisation of the field channels of the malampuzha project.the proposed field channel of palappuram branch canal have been constructed long years back. theside walls and foundation of
Read moreGeneral cpp mlbc cada 2023 24 modernisation of field channel offtaking from kalyanapetta branch canal at ch3/500 km (sluice no 30)(second reach)
General cpp mlbc cada 2023 24 modernisation of field channel offtaking from kalyanapetta branch canal at ch 3/500 km (sluice no 30)(second reach)
Read moreGeneral cpp mlbc cada 2023 24 modernisation of field channel from sluice no.39 (lhs) at ch 5/020 km of edayankulambu branch canal
General cpp mlbc cada 2023 24 modernisation of field channel from sluice no.39 (lhs) at ch 5/020 km of edayankulambu branch canal
Read moreGeneral cpp mlbc cada 2023 24 modernisation of field channel offtaking from kalyanapetta branch canal at ch3/500 km (sluice no 30)(second reach)
General cpp mlbc cada 2023 24 modernisation of field channel offtaking from kalyanapetta branch canal at ch3/500 km (sluice no 30)(second reach)
Read moreGeneral-kyip cada 2024-25-renovation and modernisation works to kannipoyil fb and field channel- general civil work
General-kyip cada 2024-25-renovation&#x0d and modernisation&#x0d works to kannipoyil fb and field channel-&#x0d general civil work
Read moreGeneral-cpp-mlbc-cada 2023-24-modernisation of tail end field channel of chenthony distributory-general civil work
Clearing grass demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 cc 1_1 5_3 centering and shuttering platering etc
Read moreof your Industry type