Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Wbpwdte/Ee/Bed/Niq 10/Q Of 2025 26
|
Description |
Repair And Renovation Works Of Electrical Installation Of Three Phase Electric Power Socket To 3 Phase Machines, Air Conditioner And Sitc Of G Plus 2 Mrl Lift At Raipur Government Polytechnic, Bankura Electrical Installation Work, Sitc.....
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WBPWD_873224_1 |
Reference Number |
WBPWDTE/EE/BED/NIQ_10/Q of 2025-26 |
Tender Fee | 0 |
EMD | 50430 |
Tender Value | |
Place | Raipur Government Polytechnic |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1965413 |
Start Date | July 05, 2025 00:25 |
End Date |
18/07/2025 ( Expired 3 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual maintenance estimate of ei of state forensic laboratory belgachia road kolkata 37 repair and renovation of electrical installation work including ac machines and transformer
Annual maintenance estimate of ei of state forensic laboratory belgachia road kolkata 37 repair and renovation of electrical installation work including ac machines and transformer
Read moreRate contract for repair of air conditioner at l-2(hcc-spbi) station, khyber pass depot, sultanpur depot, mall road office, lmc office, rss and gurugram staff quarter of line-2 including air conditioner and other electrical appliances of...
Rate contract for repair of air conditioner at l-2(hcc-spbi) station, khyber pass depot, sultanpur depot, mall road office, lmc office, rss and gurugram staff quarter of line-2 including air conditioner and other electrical appliances of...
Read moreSitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649 5514 including plc based amf panel, complete cabling, construction of c.c. foundation and other associated works complete at tw in zone 1 and 2 in muzaffarngr
Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649 5514 including plc based amf panel, complete cabling, construction of c.c. foundation and other associated works complete at tw in zone 1 and 2 in muzaffarngr
Read moreRepair and renovation of electrical installation works at 12 belvedere road
Repair and renovation of electrical installation works at quarter no.5 2nd floor, at 12, belvedere road, alipore, kolkata-700027.
Read moreElectrical installation, wiring, illumination, power point, light and fan point works in the crm centre labs, microwave lab, g-14, g-15, g-6, g-7, f-3, f-4 rooms, electromagnetic simulation compilation laboratory and computer lab in electronics engg
Electrical installation, wiring, illumination, power point, light and fan point works in the crm centre labs, microwave lab, g-14, g-15, g-6, g-7, f-3, f-4 rooms, electromagnetic simulation compilation laboratory and computer lab in electronics engg
Read moreRepair/ maint of dg sets, voltage stabilizer, cranes, services of incinerators, washing machines, air compressor, lightning arresters, earthing in eletrical installation and allied items at acc and s under ge(n) ahilyanagar.
Repair/ maint of dg sets, voltage stabilizer, cranes, services of incinerators, washing machines, air compressor, lightning arresters, earthing in electrical installation and allied items
 at acc and s under ge(n) ahilyanagar.
Read moreRepairing of electrical wiring , switch boards and installation of 3 phase electric sub meter board and compound light at iq building at tikhampur in ballia oa.
Repairing of electrical wiring , switch boards and installation of 3 phase electric sub meter board and compound light at iq building at tikhampur in ballia oa.
Read moreConstruction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of solar system (10 kw).
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection&#x0d and allied works - sitc of solar system (10 kw).
Read moreSpecial repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala
Special repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala
Read moreConstruction of shaft for installation of g plus 2 passenger lift in opd block of ent and ophthalmology at govt. smhs hospital srinagar
Construction of shaft for installation of g plus 2 passenger lift in opd block of ent and ophthalmology at govt. smhs hospital srinagar
Read moreof your Industry type