Tender Details

Particulars Details
Title
Maintenance Work Of Nh 74 New Nh 34 And 734 From Design Chainage Km. 000 To Km. 71.614 In The State Of Uttarakhand And Uttar Pradesh Except Eup Mitigation Portion
Description
Maintenance Work Of Nh 74 New Nh 34 And 734 From Design Chainage Km. 0.000 To Km. 71.614 In The State Of Uttarakhand And Uttar Pradesh (Except Eup Mitigation Portion)
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_168648_1
Reference
Number
NHAI/PIU-NBD/NH-74/2023/1
Tender Fee 25000
EMD 3.53 Lakh
Tender Value -
Place Najibabad
Link
View Original Tender Notice

https://etenders.gov.in

Start Date September 23, 2023 20:00
End Date
Expired 09/10/2023

Expired 1104 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Read more
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Read more
Rehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)

Rehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)

Read more
Landslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode

Landslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode

Read more
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha

Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha

Read more
Consultancy services for authority engineer for supervision of widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttar

Widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttarakhand on epc mode.

Read more
Maintenance work of nh-74 new nh-34 and 734 from design chainage km. 000 to km. 71.614 in the state of uttarakhand and uttar pradesh except eup mitigation portion

Maintenance work of nh-74 new nh-34 and 734 from design chainage km. 0.000 to km. 71.614 in the&#x0d state of uttarakhand and uttar pradesh (except eup mitigation portion)

Read more
Consultancy services of authority engineer for haridwar nagina section of nh 74 including eup mitigation measures

Consultancy services of authority engineer for four laning of haridwar nagina section of nh 74 including eup mitigation measures

Read more
Cs of ae for 4l of haridwar nagina section of nh-74 from km. 0.000 (dc0.000) to km. 73.000 (dc 71.614) in uk and up. 4l of haridwar-nagina section of eup mitigation measures on nh-74 in ukunder nhdp phase-iv on epc mode

&#x0d cs of ae for 4l of haridwar nagina section of nh-74 from km. 0.000 (dc0.000) to km. 73.000 (dc 71.614) in uk and up. 4l of haridwar-nagina section of eup mitigation measures on nh-74 in ukunder nhdp phase-iv on epc mode &#x0d

Read more
Development, operation and maintenance of truck layby-cum-wayside amenities on a piece of land at chainage km.10.300 (rhs) of nh-734) on lease basis.

Development, operation and maintenance of truck layby-cum-wayside amenities on a piece of land at chainage km.10.300 (rhs) of nh-734) on lease basis.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise