Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Work Of Nh 74 New Nh 34 And 734 From Design Chainage Km. 000 To Km. 71.614 In The State Of Uttarakhand And Uttar Pradesh Except Eup Mitigation Portion
|
| Description |
Maintenance Work Of Nh 74 New Nh 34 And 734 From Design Chainage Km. 0.000 To Km. 71.614 In The State Of Uttarakhand And Uttar Pradesh (Except Eup Mitigation Portion)
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NHAI_168648_1 |
|
Reference Number |
NHAI/PIU-NBD/NH-74/2023/1 |
| Tender Fee | 25000 |
| EMD | 3.53 Lakh |
| Tender Value | - |
| Place | Najibabad |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | September 23, 2023 20:00 |
| End Date |
Expired
09/10/2023
Expired 1104 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreRehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)
Rehabilitation and up-gradation to 2-lane configuration of kanda to bageshwar road from km 103.25 to km 122.72 (existing chainage 110 to km 130) of nh-309a in the state of uttarakhand (package-ll) under nh(o)
Read moreLandslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Landslide treatment work from ch. 269.900 km to ch. 270.214 km (crown portion at totaghati) on nh-07 (old nh-58) in the state of uttarakhand under annual plan 2025-26 - under epc mode
Read moreConsultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Read moreConsultancy services for authority engineer for supervision of widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttar
Widening to 2 lane paved shoulder from existing chainage 12.000 to km 40.500 badhwala to lakhwar bend realignment from km. 12.00 to 31.122 on nh-507 length-25.660 km in the state of uttarakhand on epc mode.
Read moreMaintenance work of nh-74 new nh-34 and 734 from design chainage km. 000 to km. 71.614 in the state of uttarakhand and uttar pradesh except eup mitigation portion
Maintenance work of nh-74 new nh-34 and 734 from design chainage km. 0.000 to km. 71.614 in the
 state of uttarakhand and uttar pradesh (except eup mitigation portion)
Read moreConsultancy services of authority engineer for haridwar nagina section of nh 74 including eup mitigation measures
Consultancy services of authority engineer for four laning of haridwar nagina section of nh 74 including eup mitigation measures
Read moreCs of ae for 4l of haridwar nagina section of nh-74 from km. 0.000 (dc0.000) to km. 73.000 (dc 71.614) in uk and up. 4l of haridwar-nagina section of eup mitigation measures on nh-74 in ukunder nhdp phase-iv on epc mode

 cs of ae for 4l of haridwar nagina section of nh-74 from km. 0.000 (dc0.000) to km. 73.000 (dc 71.614) in uk and up. 4l of haridwar-nagina section of eup mitigation measures on nh-74 in ukunder nhdp phase-iv on epc mode 
Read moreDevelopment, operation and maintenance of truck layby-cum-wayside amenities on a piece of land at chainage km.10.300 (rhs) of nh-734) on lease basis.
Development, operation and maintenance of truck layby-cum-wayside amenities on a piece of land at chainage km.10.300 (rhs) of nh-734) on lease basis.
Read moreof your Industry type