Tender Details
Particulars | Details |
---|---|
Title |
Cleaning And Maintenace Work Of Drain In Ward 16 17 18 19 23 Of Hawamhal Amer Zone
|
Description |
Cleaning And Maintenace Work Of Drain In Ward 16 17 18 19 23 Of Hawamhal Amer Zone
|
Organisation | DLB | State Govt. and UT |
Tender Id | 2025_DLB_452618_1 |
Reference Number |
145 EXECUTIVE ENGINEER HAWAMAHAL-AMER ZONE |
Tender Fee | 1090 |
EMD | 76676 |
Tender Value | |
Place | JAIPUR |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=812507 |
Start Date | March 15, 2025 23:30 |
End Date |
24/03/2025 ( Expired 28 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Read moreTolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Read moreConstruction of boundary wall and fencing work at kile ke piche ward no. 11, vijayraghavgad, katni
Construction of boundary wall and fencing work at kile ke piche ward no. 11, vijayraghavgad, katni
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of cc drain from imam chowk to ho siddiq khan and mansoor vali in ward 08 maihar
Construction of cc drain from imam chowk to ho siddiq khan and mansoor vali in ward 08 maihar
Read moreConstruction of muktidham shed and prathna kachh and beutification work at ward no 11 tikamgarh
Construction of muktidham shed and prathna kachh and beutification work at ward no 11 tikamgarh
Read moreConstruction of rcc drain at ward no 17 house of manoj gour to house of dd verma to house sudhir jain
Construction of rcc drain at ward no 17 house of manoj gour to house of dd verma to house sudhir jain
Read moreof your Industry type