Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Preparation Of Dpr For Establishment Of Cetp With Zld Plant At Gida Area
|
| Description |
Preparation Of Dpr For Establishment Of Cetp With Zld Plant At Gida Area
|
| Organisation | Gorakhpur Industrial Development Authority | State Govt. and UT |
| Tender Id | 2025_UGIDA_1003159_1 |
|
Reference Number |
5434 Dt 05-02-2025 |
| Tender Fee | 11800 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | GIDA GORAKHPUR |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1791840 |
| Start Date | February 08, 2025 00:25 |
| End Date |
Expired
14/02/2025
Expired 589 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreNashik ambad industrial area...preparation of cetp dpr for ambad
Nashik ambad industrial area...preparation of cetp dpr for ambad and satpur midc metal finishing
Read more5 mld zld based cetp at kalibeti on turnkey basis
Survey,site investigation,detailed design,construction,procurement and installation of required&#x0d machinery,equipment and instruments,testing,commissioning,operation and maintenance of 10 years&#x0d of 5 mld capacity zld based cetp at kalibeti,odisha&#x0d
Read moreDpr preparation for establishment of district science centre at tinsukia district
Dpr preparation for establishment of&#x0d district science centre at tinsukia district
Read moreDpr preparation for establishment of district science centre at tinsukia district
Dpr preparation for establishment of district science centre at tinsukia district
Read moreEstablishment of cetp at silk tech park zakura
Establishment of cetp at silk tech park zakura
Read moreEstablishment of cetp at silk tech park zakura
Establishment of cetp at silk tech park zakura
Read moreof your Industry type