Tender Details

Particulars Details
Title
Wbbpe/Dy. Secy/E Nit 3/2023 24
Description
Food And Decoration Work In Connection With 39th State Level Annual Sports Meet
Organisation DEPARTMENT OF SCHOOL EDUCATION | State Govt. and UT
Tender Id 2024_DSE_648164_1
Reference
Number
WBBPE/Dy. Secy/eNIT-3/2023-24
Tender Fee 0
EMD 50000
Tender Value
Place WBBPE APC Bhawn, DK 7/1, Sector -II,Salt Lake, Kol
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1397562
Start Date January 17, 2024 21:30
End Date

02/02/2024 ( Expired 472 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026

E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026

Read more
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise