Tender Details

Particulars Details
Title
Pmc Work For Reconstruction Of 200 Bedded Mmg District Hospital At District Ghaziabad Uttar Pradesh India On Epc Mode
Description
Pmc Work For Reconstruction Of 200 Bedded Mmg District Hospital At District Ghaziabad Uttar Pradesh India On Epc Mode&Amp#X0d
Organisation Planning Department UP | State Govt. and UT
Tender Id 2025_DPUP_1027537_1
Reference
Number
234(SE)/General/Technical Cell/2025 dt. 07.04.2025
Tender Fee 6254
EMD 1.2 Lakh
Tender Value
Place Ghaziabad
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1857037
Start Date April 25, 2025 17:00
End Date

01/05/2025 ( Expired 56 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Read more
Improvement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.

Improvement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.

Read more
Cs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode

Cs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode

Read more
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Read more
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Read more
Rehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode

Rehabilitation of existing distressed road section of loni-burhanpur on nh-347c in the state of madhya pradesh on epc mode

Read more
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Development of sewage treatment plants and associated infrastructure for pt. deen dayal upadhyay nagar (ddu nagar), state of uttar pradesh on hybrid annuity model basis under namami gange program

Development of sewage treatment plants and associated infrastructure for pt. deen dayal upadhyay nagar (ddu nagar), state of uttar pradesh on hybrid annuity model basis under namami gange program

Read more
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise