Tender Details
Particulars | Details |
---|---|
Title |
P, L, J, Testing And Comm. Of Pipe Line For Rising Main, Cons. And Comm. Of Reservoirs And Pumping System, Source And Ancillary Works With O And M Of The System For 5 Years For 21 Villages Of Kgbas Block And 01 Urban Town Kishangarh Bas
|
Description |
P, L, J, Testing And Comm. Of Pipe Line For Rising Main, Cons. And Comm. Of Reservoirs And Pumping System, Source And Ancillary Works With O And M Of The System For 5 Years For 21 Villages Of Kgbas Block And 01 Urban Town Kishangarh Bas
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id | 2025_PHCJA_456840_1 |
Reference Number |
ACE ALWAR 01/2025-26 |
Tender Fee | 27500 |
EMD | 1.11 Crore |
Tender Value | |
Place | KISHANGARHBAS |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=820034 |
Start Date | April 07, 2025 15:30 |
End Date |
15/05/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of di pipe for the work construction of ugr laying of clear water rising main installation of pump and other allied work in connection with the work augmentation of water supply to tusura town.
Procurement of di pipe for the work construction of ugr laying of clear water rising main installation of pump and other allied work in connection with the work augmentation of water supply to tusura town.
Read moreProviding, laying, jointing, testing and commissioning of feeder pipe line work for circle jail shivpuri water supply system
Providing, laying, jointing, testing and&#x0d commissioning of feeder pipe line work for circle jail shivpuri water supply system&#x0d
Read moreAlternative source of drinking water by installation of submersible pump through rig boring system and construction of water reservoir with laying of 75mm dia. hdpe pipe-line at lalu para slum area within ward no-01, under dmc.
Alternative source of drinking water by installation of submersible pump through rig boring system and construction of water reservoir with laying of 75mm dia. hdpe pipe-line at lalu para slum area within ward no-01, under dmc.
Read moreSitc of rain gun system with hdpe pipe-line leading to holy shrine and its operation and maintenance for 3 years by using stp treated water
Sitc of rain gun system with hdpe pipe-line leading to holy shrine and its operation and maintenance for 3 years by using stp treated water
Read moreRestoration of road cut for laying rising main pipe line on link road ghanour to harimajra, bhg ghanour road to ghanour via chappar, manjoli, link road ghanour to mehdoodan, phirni of mehdoodan and link road mehdoodan to gurudwara dhana bhagat
Restoration of road cut for laying rising main pipe line on link road ghanour to harimajra, bhg ghanour road to ghanour via chappar, manjoli, link road ghanour to mehdoodan, phirni of mehdoodan and link road mehdoodan to gurudwara dhana bhagat
Read moreWadi shewadi medium project tal shindkheda dist dhule pipe distribution networks system for gravity main and sub mains of dy no 04 on right bank canal at 7830 m including operation and maintenance of an entire system for five years
Wadi shewadi medium project tal shindkheda dist dhule pipe distribution networks system for gravity main and sub mains of dy no 04 on right bank canal at 7830 m including operation and maintenance of an entire system for five years
Read moreA/r and m/o lwss bandla parnali in tehsil sadar district bilaspur (sh operation and maintenance of pumping machinery rising main distribution system storage tanks for six months.).
A/r and m/o lwss bandla parnali in tehsil sadar district bilaspur (sh operation and maintenance of pumping machinery rising main distribution system storage tanks for six months.).
Read moreProviding lis khalag jhakhari khairi etc. in g.p dhamoon tehsil distt. shimla balance work for carriage and installation of pumping machinery with allied accessories testing of rising main 250mm dia complete
Providing lis khalag jhakhari khairi etc. in g.p dhamoon tehsil distt. shimla balance work for carriage and installation of pumping machinery with allied accessories testing of rising main 250mm dia complete
Read moreFor shiftting of 11 k v, l t line and dtr 1st call. p. a. c. 1996211.00 on electrical sor 01-01-2024, completion period 183 days (i/c rainy season)
For shiftting of 11 k v, l t line and dtr pole with applied accessories from indore road grand jalsa to bairagarh kala railway crossing bhopal. (length 0.6 k m)
Read moreP and l of hdpe 315mm dia pipe at tv nagar 6th cross st, tv nagar 3rd main rd, new cons of swd and p and l of hdpe 315mm dia pipe(65m) at bagavathi st (160m) in dn.36, const of new swd at bharathidasan st , anna salai main st in dn.35, z 4, p 13
P and l of hdpe 315mm dia pipe at tv nagar 6th cross st, tv nagar 3rd main rd, new cons of swd and p and l of hdpe 315mm dia pipe(65m) at bagavathi st (160m) in dn.36, const of new swd at bharathidasan st , anna salai main st in dn.35, z 4, p 13
Read moreof your Industry type