Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Operation And Maintenance Of 3 Mld Capacity Sewage Treatment Plant In Obra Colony, Obra
|
| Description |
Annual Operation And Maintenance Of 3 Mld Capacity Sewage Treatment Plant In Obra Colony, Obra
|
| Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
| Tender Id | 2025_RVUNL_1048788_1 |
|
Reference Number |
02/SE(CMC-II)/CMD-IV/25-26 |
| Tender Fee | 590 |
| EMD | 14000 |
| Tender Value | - |
| Place | Obra Project Colony, Obra |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1905858 |
| Start Date | June 16, 2025 14:30 |
| End Date |
Expired
28/06/2025
Expired 427 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair / maint of sewage treatment plant, mbbr tank, sewage motor panels and connected items under ge (af) jamnagar no.2
Repair / maint of sewage treatment plant, mbbr tank, sewage motor panels and connected items under ge (af) jamnagar no.2
Read moreInterception & diversion ( i&d) of drains and sewage treatment plant (stp) scheme in arrah town, bihar state, including operation & maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme".
Interception & diversion ( i&d) of drains and sewage treatment plant (stp) scheme in arrah town, bihar state, including operation & maintenance period of 15 years through hybrid annuity based ppp mode under namami gange programme".
Read moreEstablishment, commissioning of 6.0mld regional combined sewage & effluent treatment facility (rcsetf) civil/common infrastructure installed treatment machinery zero liquid discharge (zld) on turnkey basis including operation & maintenance of entire plant for a period of 5 years at mundargi 4th phase industrial area, ballari district.
Establishment, commissioning of 6.0mld regional combined sewage & effluent treatment facility (rcsetf) civil/common infrastructure installed treatment machinery zero liquid discharge (zld) on turnkey basis including operation & maintenance of entire plant for a period of 5 years at mundargi 4th phase industrial area, ballari district.
Read morePeriodical routine maintenance of fire alarm system in plant and colony
Periodical routine maintenance of fire alarm system in plant and colony
Read morePeriodical comprehensive maintenance of cctv networking system in plant and colony
Periodical comprehensive maintenance of cctv networking system in plant and colony
Read moreDesign, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years.(group-02)
Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years.(group-02)
Read moreDesign, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee
Design, build, construct, install, commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee
Read moreDesign, build, construct, install adn commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee.
Design, build, construct, install adn commissioning of compost plant of 10 tpd for wet waste along with operation and maintenance of plant for 5 years including the tipping fee.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Read moreof your Industry type