Tender Details

Particulars Details
Title
Sitc Of Mgps And Mot Work For Phase Ii Of Medical College And Up Gradation Of Hospital At Pali, Rajasthan
Description
Sitc Of Mgps And Mot Work For Phase Ii Of Medical College And Up Gradation Of Hospital At Pali, Rajasthan
Organisation RSRDCC-GM | State Govt. and UT
Tender Id 2025_RSRDC_452324_1
Reference
Number
RSRDC NIT 499/2024-25 (Sl-3)
Tender Fee 4360
EMD 7.98 Lakh
Tender Value
Place Pali
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=811892
Start Date March 13, 2025 22:30
End Date

01/04/2025 ( Expired 66 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Selection of system integrator for annual maintenance of items installed at mgm medical college jamshedpur

Selection of system integrator for annual maintenance of items installed at mgm medical college jamshedpur&amp#x0d

Read more
Consultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat

Consultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Procurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for selected medical college hospitals under medical education and research department govt of assam

Procurement implementation and maintenance of hospital management information system along with required it and ict infrastructure for &amp#x0d selected medical college hospitals&amp#x0d under medical education and research department&amp#x0d govt of assam&amp#x0d

Read more
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna

Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna

Read more
Up keep and maintenance of electrical work at 200 cusec and 270

Up keep and maintenance of electrical work at 200 cusec and 270 &amp#x0d cusec campuses at murad nagar and raj nagar campuses in &amp#x0d ghaziabad

Read more
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise