Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Retaining Wall Near Manjiri Garden And Front Of Gulshan House At Lower Julakhri Ward Julakhri Mc Chamba
|
Description |
Construction Of Retaining Wall Near Manjiri Garden And Front Of Gulshan House At Lower Julakhri Ward Julakhri Mc Chamba
|
Organisation | Directorate of Urban Development | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 500 |
EMD | 11500 |
Tender Value | |
Place | MC Chamba |
Link |
AAAAAAAAAA Login to view |
Start Date | May 05, 2025 22:30 |
End Date |
26/05/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreConstruction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Construction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreConstruction of fast track buildings at iit bombay
Construction of fast track buildings including design ,drawing, finishing works, water supply and sanitary installations, internal and external electrical installation , lan, wifi,cctv, fire-fighting system, automatic fire alarm etc. at iit bombay
Read moreMaintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Maintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreof your Industry type