Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Making A 600 A Rating Aluminium Bus Bar System And Connection With Aluminium Strip From Transformer Terminal To Side Wall Of Transformer Room. Also Laying Of Cable From Bus Bar To Fuse Unit And Also To Distribution Pole In Rest House Sub
|
Description |
Providing And Making A 600 A Rating Aluminium Bus Bar System And Connection With Aluminium Strip From Transformer Terminal To Side Wall Of Transformer Room. Also Laying Of Cable From Bus Bar To Fuse Unit And Also To Distribution Pole In Rest House Sub
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_319909_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/65 Date 25.10.2024 |
Tender Fee | 0 |
EMD | 2800 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331609 |
Start Date | October 26, 2024 16:30 |
End Date |
06/11/2024 ( Expired 244 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supplying and laying new power cable from transformer to keb meter in lt panel room at te bldg. krishnapur hubli.
Supplying and laying new power cable from transformer to keb meter in lt panel room at te bldg. krishnapur hubli.
Read moreShifting of latice mast from dakra coal stock to new loaction under dakra ocp, laying of ofc from nearest wan point at pm 10 analyzer room at dakra and kdh respectively also for rohini d1 and providing of 10 nos. lan connection for access of sap, e-o
Shifting of latice mast from dakra coal stock to new loaction under dakra ocp, laying of ofc from nearest wan point at pm 10 analyzer room at dakra and kdh respectively also for rohini d1 and providing of 10 nos. lan connection for access of sap, e-o
Read more11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
Read moreSupply and laying of 02 nos 120 sqmm cable from transformer to internal panel room including mccb at stc kashipur
Supply and laying of 02 nos 120 sqmm cable from transformer to internal panel room including mccb at stc kashipur
Read moreTender for the work of erection of pole mounted 100kva distribution transformer centre and laying of 11kv 3 core, 300 sq.mm aluminium, xlpe insulated, flat wire armoured cable at souzamol, collem, under the jurisdiction of sub div-iv, div-vii, curcho
Tender for the work of erection of pole mounted 100kva distribution transformer centre and laying of 11kv 3 core, 300 sq.mm aluminium, xlpe insulated, flat wire armoured cable at souzamol, collem, under the jurisdiction of sub div-iv, div-vii, curcho
Read moreZone-1 chhata room no. 53 trans yamuna colony phase-2 work of laying interlocking tiles on drain and side track on the right side of the road from dr. manoj jain to transformer.
Zone-1 chhata room no. 53 trans yamuna colony phase-2 work of laying interlocking tiles on drain and side track on the right side of the road from dr. manoj jain to transformer.
Read moreZone-1 chhata room no. 53 trans yamuna colony phase-2 work of laying interlocking tiles on drain and side track on the left side of the road from dr. manoj jain to transformer.
Zone-1 chhata room no. 53 trans yamuna colony phase-2 work of laying interlocking tiles on drain and side track on the left side of the road from dr. manoj jain to transformer.
Read moreSupply and fitting of biometric lugs in end cable terminal of transformer ,bus-bar and 440v switches at govindpur colliery sub-station under abg colliery
Supply and fitting of biometric lugs in end cable terminal of transformer ,bus-bar and 440v switches at govindpur colliery sub-station under abg colliery
Read moreRenovation of the electrical panel room and making arrangements for laying of electrical cables from transformer to the panel room at neepco complex guwahati
Renovation of the electrical panel room and making arrangements for laying of electrical cables from transformer to the panel room at neepco complex guwahati
Read moreMaking of ht and lt bus-system from 3.3 kv goab to 630 kva, 3.3 kv/440v distribution transformer and 800 a distribution lt switch to three nos. outgoing feeder replacing cable system for proper power supply, fabrication and installation of shed
Making of ht and lt bus-system from 3.3 kv goab to 630 kva, 3.3 kv/440v distribution transformer and 800 a distribution lt switch to three nos. outgoing feeder replacing cable system for proper power supply, fabrication and installation of shed
Read moreof your Industry type