Tender Details

About Tender

🛡️ Procurement Opportunity: Etch Primer With Spray Reducer 🎨 The Department Of Defence Production Within The Ministry Of Defence Is Seeking Bids For The Supply Of Etch Primer With Spray Reducer, Specifically 1:1 Ratio. 🔧 📅 Bid Submission Deadline: May 28, 2024, 9:00 Pm Ist Suppliers Must Provide Detailed Bids That Include Product Specifications, Pricing, And Delivery Schedules, In Accordance With The Procurement Guidelines Set Forth By The Ministry. Keywords: Etch Primer, Spray Reducer, 1:1 Ratio, Defence Production, Ministry Of Defence, Procurement, Bid Submission
Particulars Details
Title
Etch Primer With Spray Reducer 1 Isto1,Etch Primer With Spray Reducer 1 Isto1,Etch Primer With Spray
Description
Organisation Department of Defence Production | Ministry of Defence
Tender Id GEM/2024/B/4957867
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date May 18, 2024 17:38
End Date
Expired 28/05/2024

Expired 858 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Ministry: Ministry Of Defence
Department: Department Of Defence Production
Organisation: Hindustan Aeronautics Limited (hal)

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 DURGA COLOUR & CHEM PVT LTD - 28-05-2024 15:36:38 MSE Evaluated
2 M/S SLEEN OVERSEAS - 28-05-2024 20:47:34 MSE Evaluated
3 SOUTHFIELD COATINGS PRIVATE LIMITED - 28-05-2024 19:11:13 MSE Evaluated
4 TOYO PAINTS PRIVATE LIMITED - 27-05-2024 17:52:35 MSE Evaluated
Similar Tenders
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds

Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds

Read more
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise