Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Hot Work Installation Termination Assistance During Stw Testing And Trial
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/5426268 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | 2 Crore |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 21, 2024 23:12 |
| End Date |
Expired
14/10/2024
Expired 727 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreTggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreKtps vii stage- adm-ss-periodical testing ,painting ,repairs and reconditioning of 40nos argon gas cylinders in outdoor dtores-ii/ss division during the fy 2026-27
Ktps vii stage- adm-ss-periodical testing ,painting ,repairs and reconditioning of 40nos argon gas cylinders in outdoor dtores-ii/ss division during the fy 2026-27
Read moreCustom bid for services - hot work installation termination assistance during stw testing and trial
Read more
Custom bid for services - part 2 hot work installation termination assistance during stw test and
Read more
Custom bid for services - part 1 hot work installation termination assistance during stw test and
Read more
Custom bid for services - part 1 hot work installation termination assistance during stw test and
Read more
of your Industry type