Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 2 Lane With Paved Shoulder Greenfield Bypass For Lalganj Ajhara Mohanganj And Raniganj On Raebareli Jaunpur Section (Design Km 0.000 To 53.177) Of Nh 31 In The State Of Uttar Pradesh On Hybrid Annuity Mode
|
| Description |
Construction Of 2 Lane With Paved Shoulder Greenfield Bypass For Lalganj Ajhara Mohanganj And Raniganj On Raebareli Jaunpur Section (Design Km 0.000 To 53.177) Of Nh 31 In The State Of Uttar Pradesh On Hybrid Annuity Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_232027_1 |
|
Reference Number |
NHAI/HQ/UP(E)/Rbl/ Pratapgarh Bypass/NH-31 |
| Tender Fee | 80000 |
| EMD | 7.35 Crore |
| Tender Value | |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=262095 |
| Start Date | April 04, 2025 18:45 |
| End Date |
Expired
20/05/2025
Expired 423 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreIe services for supervision of construction of 2-lane with paved shoulder greenfield bypasses in lalganj ajhara mohanganj and raniganj on raebareli jaunpur section of nh-31 in uttar pradesh on ham(total length50.447 km.)
Ie services for supervision of construction of 2-lane with paved shoulder greenfield bypasses in lalganj ajhara mohanganj and raniganj on raebareli jaunpur section of nh-31 in uttar pradesh on ham(total length50.447 km.)
Read moreIndependent engineer services for supervision of construction of 2-lane with paved shoulder greenfield bypasses in lalganj ajhara-mohanganj-raniganj on raebareli-jaunpur section of nh-31 in the state of uttar pradesh on ham (50.757 km)
Independent engineer services for supervision of construction of 2-lane with paved shoulder greenfield bypasses in lalganj ajhara-mohanganj-raniganj on raebareli-jaunpur section of nh-31 in the state of uttar pradesh on ham (50.757 km)
Read moreConst of 2lane gf bypasses in lalganj ajhara mohanganj and raniganj on raebareli jaunpur sec of nh31 in the state of uttar pradesh on ham.
Const of 2lane gf bypasses in lalganj ajhara mohanganj and raniganj on raebareli jaunpur sec of nh31 in the state of uttar pradesh on ham.
Read moreIe services for 4-lane unnao-lalganj section of nh-232a (nh-31) from design km 00.000 to design km 70.000 under bharatmala pariyojana on hybrid annuity mode in the state of uttar pradesh 3rd call
Ie services for 4-lane unnao-lalganj section of nh-232a (nh-31) from design km 00.000 to design km 70.000 under bharatmala pariyojana on hybrid annuity mode in the state of uttar pradesh 3rd call
Read moreConstruction of 4 lane greenfield section of nh-33 from mokama (design ch. 0.000) to munger (design ch. 82.400) in the state of bihar on hybrid annuity mode
Construction of 4 lane greenfield section of nh-33 from mokama (design ch. 0.000) to munger (design ch. 82.400) in the state of bihar on hybrid annuity mode
Read moreDevelopment of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.
Development of ujjain-jaora access controlled greenfield highway including ujjain spur connectivity as 4-lane with paved shoulder (design length - 98.73 km) in the state of madhya pradesh on hybrid annuity mode.
Read moreUpgradation to four lane with paved shoulder of kalavad-jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat on hybrid annuity mode.
Upgradation to four lane with paved shoulder of kalavad-jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat on hybrid annuity mode.
Read moreof your Industry type