Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Special Repair Of Soharwa Link Road Km. 1 To 2 In Financial Year 2023 24. (Vidhan Sabha Matera)
|
| Description |
Special Repair Of Soharwa Link Road Km. 1 To 2 In Financial Year 2023 24. (Vidhan Sabha Matera)
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_CEDPW_872146_12 |
|
Reference Number |
2143/8 Kam/e_Tendering/2023-24 Dated 08-12-2023 |
| Tender Fee | 2715 |
| EMD | 4.4 Lakh |
| Tender Value | |
| Place | Bahraich |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | December 19, 2023 20:30 |
| End Date |
Expired
03/01/2024
Expired 919 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair of link road hardoi neer road to kataiya. (l-1.10 km)
Repair of link road hardoi neer road to kataiya. (l-1.10 km)
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreProvn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Provn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Read moreIe services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreSpecial repairs to 08 quarters sailors married accomodation ganga p 24 and gomati p 24a at 2n det and provn of 01 split ac for so wks at hq tnp at ins adyar under ge navy chennai
Special repairs to 08 quarters sailors married accomodation ganga p 24 and gomati p 24a at 2n det and provn of 01 split ac for so wks at hq tnp at ins adyar under ge navy chennai
Read moreSpecial repair to bldg no p-307 apu and 02 x toilet inside tech area of 506 abw jabalpur and provn of parking shed at offrs residential accn at tipu sultan road, cod estate under ge (e) jabalpur
Special repair to bldg no p-307 apu and 02 x toilet inside tech area of 506 abw jabalpur and provn of parking shed at offrs residential accn at tipu sultan road, cod estate under ge (e) jabalpur
Read moreConstruction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreSpecial repair of soharwa link road km.-1 _300_ in financial year 2025-26. vidhan sabha matera
Special repair of soharwa link road km.-1 _300_ in financial year 2025-26. vidhan sabha matera
Read moreof your Industry type